My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:29:34 PM
Creation date
11/8/2018 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\707\PR0505735\COMPLIANCE INFORMATION 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFORMATION 2008 - 2015
QuestysRecordDate
6/29/2018 3:29:31 PM
QuestysRecordID
3930717
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Met iod Developed By: X Piping Manufacturer ❑Industry Standard LI Professional Engineer <br /> Other(Specie) <br /> Test Met iod Used: X Pressure ❑Vacuum I I Hydrostatic <br /> CI Other(Specify) _ <br /> Test Equ pment Used: Pressure Gauge Equipment Resolution: 0-15 PSI <br /> Piping Run# 1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping aterial.: Fiberglass Fiberglass Fiberglass <br /> Piping nufacturer: Ameron Ameron Ameron <br /> Piping E ameter: 3" 3" 3" <br /> Length Piping Run: 25' 20' 20' <br /> Product tored: Diesel Diesel Sate Diesel Sate <br /> Method nd location of Test boot Test boot Test boot Test boot <br /> piping-n n isolation: <br /> Wait tim between applying <br /> pressure acuum/water and 5 min 5 min 5 min 5 min <br /> starting st: <br /> Test Stai I Time: 9:50 11:00 11:00 <br /> Initial Rt ading(R,): 5 PSI 5 PSI 5 PSI <br /> Test Eril Time: 10:50 12:00 12:00 <br /> Final Re ding(Rr) 5 PSI 5 PSI 5 PSI <br /> Test D tion: I Hour I Hour I Hour I Hour <br /> Change Reading(RF-R,): 0 0 0 <br /> Pass/Fai Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Rsuit: x Pass ❑Fail x Pass ❑Fail x Pass ❑Fail ❑ Pass ❑Fail <br /> Com ints—(include in ormation on repairs made prior to testing, and recommended oUow-u jor failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.