My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2300 - Underground Storage Tank Program
>
PR0232261
>
COMPLIANCE INFO 2007 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:19:49 PM
Creation date
11/8/2018 9:54:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2010
RECORD_ID
PR0232261
PE
2361
FACILITY_ID
FA0002590
FACILITY_NAME
THORNTON 76
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\THORNTON\8606\PR0232261\COMPLIANCE INFO 2007 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2010
QuestysRecordDate
2/27/2018 5:13:36 PM
QuestysRecordID
3808429
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirements. Determine dimension (B)from the <br /> STEP 9: TIGHTEN SELF-CLINCHING STUDS measurements taken in Step 1, Figure 1 (Top of the HOW TO LOCATE THE POSITION OF THE Measuring Slick <br /> Tighten clinch studs securely with a %'wrench. Use FSA-400 below the drain valve outlet in the spill 61SO AT 95% TANK CAPACITY <br /> only the self-clinching studs that are supplied with container to the bottom of the tank). Saw off the <br /> the unit. Seating torque is 11.5 ft-lbs min. to 13.5 ft- excess tube at a 45-degree angle and file off any ! The length of the upper tube and the placement of i <br /> lbs max. Do not over tighten. sharp burrs (Refer to Figure 16). Optional: Install the 61 SO valve body determine the shut-off point. 4 <br /> Note: Failure to properly apply and cure the the OPW/POMECO Tank Bottom Protector on the Following the standard instructions for the OPW <br /> sealant may result in a failure of a pressure lower tube(Refer to Installation instructions supplied 61 SO will provide for initial shutoff at 95%. In all <br /> decay leak test. with the 6110 Tank Bottom Protector). cases, the upper tube length must be a minimum of <br /> 6-1/2" plus the length of the riser pipe. All length Riser <br /> STEP 10: LOWER TUBE ASSEMBLY STEP 12: PREPARE FILL RISER FOR VALVE measurements are in inches. <br /> If a vise is used, clamp on the valve body casting INSERTION Pipe with (q) (g) <br /> only to avoid damage to the float. Mix the remaining INSTRUCTIONS FSA-400 To Tank To Tank <br /> sealant until the color is uniform. Using the mixing IMPORTANT: Inspect the riser pipe for any foreign i Top II(I.D.) Bottom <br /> stick, generously apply sealant to the first 6 male material. Over spray from tank relining or any 1.) Find tank capacity(in gallons)from tank W <br /> threads on the valve body as shown in figure 10. internal burrs inside of pipe must be removed prior calibration chart provided by tank manufacturer. <br /> Make sure coverage is completely around the to installation. Failure to have an unobstructed riser <br /> threads, and work the sealant down into the thread pipe may preventro er installation or operation of o <br /> p p <br /> 2.} Calculate 95/0 of capacity. <br /> profile. Quickly thread the lower tube onto the valve the valve. Thoroughly clean top of user pipe. <br /> body. Tighten the tube securely by hand or with a 3.) Locate the 95% volume number on the tank <br /> strap wrench. Remove excess sealant and smooth important: Before installing the valve, allow calibration chart. <br /> sealant bead with water moistened mixing stick, sealant to cure for 24 hours. EXAMPLE <br /> 4.) Find the dipstick number(X)which corresponds 1.) For an Owens-Corning Model G-3 Fiberglass® <br /> Important: Allow sealant(epoxy)to cure for 24 STEP 13: REMOVE ELASTIC BAND to the 95% tank volume. And, find the dipstick Tank Calibration Chart: <br /> hours before installing into tank. Remove the elastic band securing the float to the number(Y)which corresponds to the Tank Capacity- 10,000 gal., nominal 9,403 gal, <br /> valve body. The float will move into an outward I 100%volume. NOTE: Use actual capacity only <br /> position. 2.)95% of actual tank capacity=0.95 x <br /> 5.)Subtract the dipstick number(X)from the tank 9403 gal. =8933 gal. <br /> Apply Sealant completely STEP 14: INSERT DROP diameter(Y)to find the upper tube reference <br /> around first 6 threads. TUBE number(Z). <br /> Make sure h 3.)The closest number which is less than 8933 al. P <br /> the O-Rin gasket is _ - <br /> 99 Y X - g <br /> under the flange of the inlet O { } (Z) Is 8910 gal. Choosing the closest number less <br /> tube. Hold the float down than 95% of actual capacity ensures that the <br /> 6.)Subtract tract 2 from {Z)to find the upper tube depth initial shutoff will occur when the tank is no more <br /> against the valve body and C • <br /> slowly insert the drop tube (Z) -2" = C than 95%full. <br /> overfill valve into the riser pipe, <br /> Do not force valve into the riser 7.) Is C less than 6-1/2"? 4.)The calibration chart reading of 8910 gal. <br /> pipe. If any obstruction or corresponds to a dipstick measurement of 82". <br /> foreign matter interferes with NO Upper tube length is C plus the distance <br /> smooth insertion of the valve, from fhe top of the FSA-400 Face Seal 5.) Dipstick number(X)=82" <br /> Figure 10 the riser pipe must be cleared. E Adaptor installed on the riser pipe to the Tank diameter(Y) =92" <br /> g inside, top lip of the storage (A). (X}-(Y)= (Z) (92 "-82" = 1011) ;> <br /> WARNING (Z) = 10" <br /> Note: Before installing the valve in the tank, a Failure to follow the assembly Upper Tube length = C + (A) <br /> pressure test can be performed on the valve to and installation instructions 6.) (Z)-2"W C (10"-2" =8") <br /> check for vapor tightness. Seal off both ends of the or use of excessive force toYES Upper tube length is 6-112" plus the riser C -8' <br /> tube with inflatable plumber's plugs, Apply a insert the OPW 61SO will pipe measurement (A). <br /> maximum 10"W.C. (1/3 PSI) air pressure. If VOID THE WARRANTY] 7.) Is 8" less than 6-1/2"? <br /> pressure does not hold and a leak can be locatedUpper Tube Length =6-1/2" + (A) <br /> with soap solution, do not install the valve. Send the NO Measure the distance from the top of the <br /> valve back to OPW for warranty evaluation. Difficulty in removing the NOTE: You must find the actual tank capacity FSA-400 Face Seal Adaptor installed on the11 <br /> Caution: Do not over-pressure. Excess pressure existing fill tube(if there Is one) Figure 14 number that correlates to the 6-112"+(A)depth for riser pipe to the inside, top lip of the storage <br /> can damage the valve means there may be an the station records. This number may also be used tank and obtain measurement(A). <br /> obstruction in the riser pipe. Look for burrs, for the purposes of calibrating an electronic tank <br /> STEP 11: CUT LOWER TUBE AT 450 ANGLE deformations, excess tank lining material or other level system. Upper tube length = C + (A) <br /> Measuring from the underside of the inlet tube projections that may interfere with easy insertion of <br /> flange, mark the overall length of the drop tube a the OPW 61 SO. The 61 SO is designed for insertion o Registered T.M.-Owens coming Fiberglass Corporation <br /> distance of(B) minus 6"or as per local codes or into schedule 40 pipe. If schedule 80 pipe has been <br /> OPW 61 SO Overfill Prevention Valve Page 6 OPW 61SO Overfill Prevention Valve page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.