My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2300 - Underground Storage Tank Program
>
PR0232261
>
COMPLIANCE INFO 2007 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:19:49 PM
Creation date
11/8/2018 9:54:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2010
RECORD_ID
PR0232261
PE
2361
FACILITY_ID
FA0002590
FACILITY_NAME
THORNTON 76
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\THORNTON\8606\PR0232261\COMPLIANCE INFO 2007 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2010
QuestysRecordDate
2/27/2018 5:13:36 PM
QuestysRecordID
3808429
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br /> used for the riser, the 61 SO can not be installed. If Vapor Recovery <br /> GENERAL INSTRUCTIONS seamed pipe has been used, the internal weld bead Riser Flt!Riser <br /> Normal Operation:A Hose"Kick"and reduced flow may interfere with the OPW 61 SO and prevent <br /> The OPW 61 SO Overfill Prevention Valve is signal that the tank is full. Close transport delivery installation. If the OPW 61SO won't slip in easily <br /> designed for tight fill, gravity drop applications to valve and drain hose into tank before disconnecting DON'T FORCE IT! Damage to the valve may result <br /> help prevent accidental or intentional overfilling of any hose fitting, if excess force is used. Examine the riser pipe 6"Max, I <br /> underground storage tanks. It is installed in the UST carefully; determine the nature of the obstruction, „_ <br /> drop tube in place of a standard drop tube. Overfilled Tank: Failure of the hose to drain after take appropriate steps#o remove it. or30m vMt I i I <br /> The main 61S0 valve closes when liquid level is at Closing the delivery valve signals an overfilled tank. aauo <br /> PW <br /> 95% of the top of the tank. A small bypass valve Do Not Disconnect any delivery hose fitting until the 1s°minimum <br /> remains open to allow the delivery hose to drain at liquid level in the tank has been lowered to allow the STEP 15: CHECK Tube cut clearance for <br /> 3-5 gallons per minute. If the delivery truck valve is hose to drain into the tank. Attention: In the event INSTALLATION per Lco Float <br /> not closed after initial shut-off, the bypass valve will you are splashed, remove all wetted clothing Insert the drop tube all the Requirements <br /> way into the tank until the ----------------------- <br /> ____ ______________ ' __ <br /> close and will restrict all fuel delivery. immediately. Do not go into an enclosed area and y <br /> stay away from ignition sources. flange and gasket seat _ 1&.(or as per local requirements) <br /> The 61 SO-EVR models of the 61 SO are designed to onto the top of the FSA- F <br /> be installed with the following OPW products: FSA- IMPORTANT 400. The float will swing \ Align Float Along Length of Tank —0 <br /> 400 Face Seal Adapter, 1-2100-EVR Series Spill Determine if the underground storage tank is out into the operating <br /> Container or POMECO Multi-port, 61JSK Jack equipped with a ball float vent valve similar to position as it passes into Figure 16 <br /> Screw Kit, 61 SALP-EVR Series Rotatable Product the OPW 53VML, as illustrated in Figure 16. In all the tank. <br /> Adaptor, and 634TT-EVR Series Product Cap. systems, the shut-off point of the 61SO must be Make sure that the float is <br /> reached before the ball float reduces flow to aligned along the length <br /> IMPORTANT ensure proper overfill valve operation. of the tank. The length of <br /> Read these assembly and installation instructions the tank can easily be <br /> completely and carefully prior to starting. Check to determined by locating 61 Rotatable <br /> make sure all parts have been provided. Use only TOOLS NEEDED FOR INSTALLATION AND other manholes or pump Product <br /> the parts supplied; substitution of parts may cause ASSEMBLY: boxes that are installed Adaptor <br /> product failure. 1. Drill around other tank fittings. m� <br /> 2. A sharp 118" pilot drill bit Look into the drop tube <br /> Failure to follow instructions may cause improper 3. A sharp 5116"drill bit and align the deflector <br /> product operation or premature failure which may 4. Tape measure with the length of the tank. <br /> permit storage tank overfill. An overfilled storage 5. Hacksaw or cut-off saw,fine tooth; 24 teeth/inch CAUTION: No obstruction Figure 15 Drain al ° <br /> P 9 9 Drain Valve ,-zoo <br /> tank may create hazardous conditions and/or 6. Fine half round file in the tank can be within o Series <br /> environmental contamination. 7. Screwdriver- Phillips blade 13"from the center of the riser pipe or the valve may c� ner <br /> 8. %"Wrench or socket not operate properly. 61JSK-4400 <br /> ,lack Screw FSA-400 Face <br /> CAUTION 9. Two-part sealant(Supplied) mt Seal Adaptor <br /> Do not remove elastic band from around float until 10. Torque Wrench STEP 16: ALIGN VALVE Figure 16A <br /> instructed to do so, as damage to valve may result. Instal!the OPW JSK-4400 Jack Screw Kit and a 4" g <br /> WARNING nipple to lock the valve in place. Refer to the <br /> WARNING Using electrically operated equipment near gasoline Installation Instructions supplied with the Jack Screw STEP 17: INSTALL WARNING <br /> Failure to properly connect delivery hose and elbow, or gasoline vapors may result in fire or explosion, Kit. Install the 61 SALP-EVR Rotatable Product PLATE <br /> and/or disconnecting a liquid filled delivery hose or causing personal injury and property damage. Adaptor(Refer to Installation Instructions supplied Slide the tie wrap over the <br /> elbow will result in a hazardous spill, which may Check to assure the working area is free from such with the 61 SALP-EVR.) Make sure that the valve warning plate ears and position <br /> result in personal injury, property damage, fire, hazards, and always use proper precautions. does not rotate while tightening the adaptor by warning plate against riser pipe <br /> explosion, and water and soil pollution. observing the position of the deflector. The valve approximately 1" below the <br /> Make sure all connections, including the hose IMPORTANT: The figures in this installation and must remain aligned along the length of the tank adaptor. Tighten the tie wrap <br /> as in Step 15. Repeat this step as necessary#o securely. The valve is now fully <br /> and elbow connections, between storage tank maintenance instruction may contain vapor recovery assure proper valve alignment. installed and in operating <br /> and transport are securely coupled. equipment(including model numbers)that is not <br /> " Make sure the lip seal and/or all gaskets in the certified by the California Air Resources Board position. <br /> delivery elbow are properly in place to prevent (CARB)for a specific Phase I Vapor Recovery <br /> spills. System. Please refer to Exhibit 1 of the appropriate STEP valve <br /> VALVE REMOVAL <br /> Do not operate with damaged or missing parts, CARB Phase I Executive Order for a list of certified The vallve can be removed far Figure 17 <br /> which prevent tight connections. Phase I Vapor Recovery System Equipment. tank leak testing, inspection, <br /> etc., by removing the 61 SALP-EVR Rotatable <br /> Product Adaptor, the 4" nipple, and the 61JSK4400 <br /> Jack Screw Kit. Reinstall per the above instructions. <br /> OPW 61 SO Overfill Prevention Valve Page 2 OPW 61SO Overfill Prevention Valve Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.