My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
COMPLIANCE INFO 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:19:01 PM
Creation date
11/8/2018 9:55:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\3775\PR0231418\COMPLIANCE INFO\COMPLIANCE INFO 2012-2015.PDF
QuestysFileName
COMPLIANCE INFO 2012-2015
QuestysRecordDate
10/10/2017 8:57:48 PM
QuestysRecordID
3096410
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�./ Page 6 of 9 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures. Equipment Resolution: <br /> UDC#9/10 UDC#11 / 12 UDC# UDC # <br /> UDC Manufacturer: <br /> UDC Material: Fiberglass Fiberglass <br /> UDC Depth: 30" 30" <br /> Height from UDC Bottom to Top 8" 8" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 5" 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Fair Fair <br /> testing: <br /> Portion of UDC Tested Above highest Above highest Above highest Above highest <br /> penetration penetrwHon penetration penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes [-]No®NA ❑Yes E]No®NA ❑Yes [:]No®NA E]Yes [:]No®NA <br /> product and water)? <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes [-]No®NA ❑Yes❑No®NA ❑Yes ❑No®NA ❑Yes ❑No®NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No®NA ❑Yes❑No®NA ❑Yes ❑No®NA ❑Yes ❑No®NA <br /> operational?* <br /> Wait time between applying ' <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 3:22pm 3:02 m <br /> Initial Reading(R,): 2.6255 1.8103 <br /> Test End Time: 3:37pm 3:17pm <br /> Final Reading(Rr): 2.6263 1.8103 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Chane in Reading(R,:-R,): 0.00082 0 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: Pass LJ Fail ® Pass ❑Fail El Pass ElFail ❑ Pass ❑Fail 4 <br /> Was sensor removed for testing? ®Yes❑No❑NA ®Yes❑No ❑NA ®Yes ❑No L]NA ®Yes❑No E]NA <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> ®Yes❑No E]NA ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No El NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(')is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.