My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r,I <br /> Page 3 of 8i "Ms"" <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: 0 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run # Piping Run # Piping Run # Piping Run # <br /> Piping Material: Flex Flex <br /> Piping Manufacturer: Environ Environ <br /> Piping Diameter: 11/2" 1'/2" <br /> Length of Piping Run: 20' 20' <br /> Product Stored: Diesel Diesel <br /> Method and location of piping- Sump Sump <br /> run isolation: <br /> Wait time between applying <br /> pressure/vacuumlwater and 5 min 5 m i n <br /> starting test: <br /> Test Start Time: 11:40 11:40 <br /> Initial Reading(Ri): 5 psi 5 psi <br /> Test End Time: 12:40 12:40 <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 1 hr 1 h r <br /> Change in Reading(RF-Ri): 0 0 <br /> PasslFail Threshold or Criteria: 0 0 <br /> Test Result: 10 Pass ❑ Fail © Pass ❑ Fail ❑ Pass ❑ Fail U Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.