Laserfiche WebLink
SWRCB,January 2002 Page 3 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: U Piping Manufacturer U Industry Standard U Professional Engineer <br /> U Other(Specify) <br /> Test Method Used: U Pressure U Vacuum U Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> i in -mn isolation: 14 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R[): <br /> Test End Time: <br /> Final Reading(R,): <br /> Test Duration: <br /> Change in Reading(R,R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: U Pus U Fail U Pass U Fall U Pass U Fall U Pass U Fail <br /> Comments— (include information on repairs.made priorro tefting,and recommendedfollow-upforfailed tests) <br /> Safe Suction System. <br />