Laserfiche WebLink
SWRCB,January 2002 Page 4 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: U Piping Manufacturer U Industry Standard Ll Professional Engineer <br /> U Other(Specify) <br /> Test Method Used: U Pressure Ll Vacuum U Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: _ <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Stan Time: <br /> Initial Reading(111): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(Rr R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: U Pus U Fail U Pass U Fall U Pass U Fall U Pass U Fall <br /> Comments— (include information on repairs,made priorroWting,and recom mendedfollow-up forfailed tests) <br />