Laserfiche WebLink
SWRCB,January 2002 Page 5 of 8 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: U Sump Manufacturer 1Xlndustry Standard U Professional Engineer <br /> U Other(Sped) <br /> Test Method Used: U Pressure U Vacuum )0 Hydrostatic <br /> U Other(Spec) <br /> Test Equipment Used: Caldwell Equipment Resolution: <br /> Sump#1 Reg Sump#2 plus Sump# Sump# <br /> Sump Diameter: 2 4" 2411 <br /> Sump Depth: 24" 24" <br /> Sump Material: Glass Clad Steel SAME <br /> Height from Tank Top to Top of 14" 1 4" <br /> Highest Pi in Penetration: <br /> Height from Tank Top to Lowest 2011 20" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Clean/Dr Clean/Dry <br /> Portion of Sump Tested 1911 r <br /> Does turbine shut down when U Yes UNo IRNA <br /> sump sensor detects either product UYes UNo XI NA UYes UNo UNA L Yes UNo UNA <br /> or water? <br /> Turbine shutdown response tir;z' N/A N A <br /> Is system programmed for fail-safe U Yes U No LYNA <br /> shutdown?' UYes UNo NJNA UYes UNo UNA UYes UNo UNA <br /> Was fail-safe verified to be U Yes U No IXNA <br /> operational?' UY6s UNo XINA UYes UNo UNA Utes UNo UNA <br /> Wait time between applying <br /> pressure/vacuum/water and starting i hr. A hr. <br /> test: <br /> Test Start Time: 10:40 11 <br /> Initial Reading(RJ: 0 0 <br /> Test End Time: 1 1 :1 0 11 : 30 <br /> Final Reading(R,): 0 0 <br /> Test Duration: hr, <br /> Change in Reading(R,-R,): 0 0 <br /> Pass/Fail Threshold or Criteria: 0 Loss 0 L <br /> oss <br /> Test Result: LN Pass U Fall $J Pass U Fall U Pass U Fall U Paas U Fall <br /> Was sensor removed for testing? XJ Yes U No U NA IU Yes UNo UNA UYes UNo UNA U Yes U No U NA <br /> Was sensor properly replaced and X1 Yes U No U NA 4J Yes UNo UNA UYes UNo UNA UYes UNo UNA <br /> verified functional after testing? <br /> _C0MMents—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> Safe Suction System. <br /> If the testing method does not test the entire depth of the sump,specify how much of the sump was tested. Methods not testing the <br /> entire sump should only be used if the monitoring system provides fail-safe turbine shutdown. (See SWRCB LG-160) <br /> 2 With the submersible pump running,place the sensor in product(discriminating sensors should also be placed in water). The time <br /> between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br /> containment testing method used does not test the entire volume of the sump. <br /> This information is not needed if the entire sump is tested. <br />