Laserfiche WebLink
Page 4 of 6 <br /> 8'. MONITORING PLAN: (CONTINUED) <br /> These procedures along with emergency telephone numbers will be posted in the <br /> Owners office. <br /> The City of Dodi shall be responsible for contacting the local Environmental <br /> Health, Fire Department and a local petroleum maintenance contractor if a leak is <br /> confirmed. Hazardous materials shall be cleaned up in a timely manner or as <br /> required by Envirarnnental Health or Fire Departments. <br /> 9. METHOD FOR OVERFILZ+/SPILL PROTECTION AND CLEAN UP: <br /> a. GASO=/DIESEL TANK <br /> 1. Gauges: gator is to control delivery and gauge tank prior to receiving <br /> fuel load to assure adequate capacity is available for entire delivery. <br /> Driver is to remain in attendance with owners maintenance supervisor during <br /> delivery to monitor the operation. <br /> 2. Overfill Protection: The Emoo-Wheaton Automatic Overfill Protea-tion System <br /> will eliminate the possibility of overfill occurring when the product reaches <br /> the pre-determined level on the sensing tube. The valve automatically closes <br /> shut with enough roan for the delivery truck operator to drain the product <br /> remaining in the hose into the tank. In the event that this occurs, the <br /> following actions will be taken as described below: <br /> 3. Ball float system: The ball float valve system installed with the tank <br /> as a back-up to prevent the possiblity of overfilling to occur. If the tank <br /> is filled to the ball float level, the petroleum product delivery will be cut <br /> to 3 gallons per minute alerting the delivery driver of a potential overfill <br /> condition. In the event that this occurs, the following actions will be <br /> taken as described below: <br /> a. The delivery truck k operator shall turn off the petroleum product supply <br /> at the truck, leaving the hose fully connected to the tank fill pipe and <br /> the truck. <br /> b. The small amount of petroleum product remaining in the hose shall be <br /> drained back into the tank. The delivery truck operator shall partially <br /> open the two-stage reset arm to allow the product to drain. He then <br /> resets the system for normal operation. <br /> c. The hose shall be disconnected fracâ–º the fill pipe only when it has fully <br /> drained. In the event that spillage occurs upon hose disconnection, the <br /> remaining small amount of petroleum product will be caught in a 10 gallon <br /> capacity leakproof container (C'NI) . The product in the spill container <br /> will then be drained into the tank by opening a manually operated valve <br /> located in the spill container. <br />