My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
REMOVAL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:20:32 PM
Creation date
12/4/2018 10:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. DEPTH OF TANK HOLE: (CONTI=) Page 4 of 13 <br /> d. Vent and vapor return lines shall be sloped 1/4" per ft. down to the tanks. <br /> e. One pipe diameter separation at cross-avers. <br /> f. The Contractor is responsible for any design, materials, equipment, permits, <br /> etc. , for shoring or sloping a hole. <br /> 6-150.04 FILL AND BA=LL <br /> A. All fill material shall be of a granular nature, free from vegetation and extraneous <br /> material. Owner's Representative shall inspect and approve the material before it <br /> is spread. Spread material in lifts not to exceed 12 inches and tarp thoroughly. <br /> B. APPROVED BACKFILL MATERIALS: <br /> The following materials shall be used up to 12" above the tank: <br /> 1. PEA GRAVEL: A clean, naturally rounded aggregate with a 1/8" minimum and a 3/4" <br /> maximum diameter. Up to 3% of the particles may pass through a #8 sieve. <br /> 2. STONE OR GRAVEL CRUSHINGS: Washed material, with particle size between 1/8" and <br /> 1/211. Up to 3% of the particles may pass through a #8 sieve. <br /> 3. Approved materials must be dry, free of ice and snow, and meet ASTM C-33, Para. <br /> 9.1 for quality and soundness. <br /> VERIFY THAT BACKFILL MATERIAL IS IN ACCORDANCE WITH TANK MANUFACTURER'S SPECIFICATIONS. <br /> BACKFILL ABOVE THE TANK SHALL BE AGGREGATE BASE, CLASS II, COMPACTED TO 95% R.C. PER THE <br /> STANDARD SPECIFICATIONS. <br /> C. BEDDING OF TANKS <br /> 1. A 12" minimum bed of backfill material is to be placed in the hole, smoothe and <br /> sloped to allow a tank slope of 1" in 10' downward toward the fill end prior to <br /> setting the tank. <br /> 6-150.06 TANK HOLE Imo= <br /> A. Contractor is to provide and install a Filter Fabric Tank Hole Liner. <br /> 1. The entire tank hole (sides and bottom) shall be covered. Lay the fabric with 2 <br /> foot minimum overlaps. The top of the tank backfill shall also be covered with <br /> cutouts for risers, etc. <br /> 2. Bedding material is to be placed on the top of the filter fabric. Excess fabric <br /> at the top of the hole should be folded over the backfill materila at subgrade <br /> level. <br /> B. APPROVED FILTER FABRIC MATERIAL: <br /> Dupont "Typar" Spunbond Polypropylene - Style 3401; Phillips Fibers Corp. - "Supac <br /> 4np1l; Hoechst "Trevira" Sptnnbond 1115. <br />
The URL can be used to link to this page
Your browser does not support the video tag.