My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6-04.03 Beginning of Work, Time of Completion and Liquidated <br />Damages - Attention is directed to the Provisions in Section <br />8-1.03, "Beginning of Work," in Section 8-1.06, "Time and <br />Completion," and in Section 8-1.07, "Liquidated Damages," of the <br />Standard Specifications and these Special Provisions. <br />The Contractor may begin work after receiving notice that the <br />contract has been approved by the Mayor. The work shall be <br />diligently prosecuted to completion before the expiration of <br />55 WORKING DAYS. <br />Working day count shall begin 15 days after the Mayor approves the <br />contract. <br />The Contractor shall pay to the City of Lodi the sum of $160.00 <br />per day, for each and every calendar day's delay in finishing the <br />work in excess of the number of working days prescribed above. <br />Liquidated damages as described above will be charged to the <br />Contractor for each and every calendar day's delay in finishing <br />work specifically described in Section 6-04.01 "Scheduling Work." <br />6-05 CONSTRUCTION RIGHT-OF-WAY/PERMITS <br />6-05.01 Right of Way The City of Lodi has acquired the <br />rights-of-way and easements in which the improvements and <br />appurtenances shall be located and constructed. <br />The Contractor shall be responsible for making arrangements and <br />paying all expenses for any additional working or storage area <br />outside of the limits of right-of-way, unless otherwise provided <br />in the Special Provisions. <br />At 230 West Elm Street, the Contractor shall confine the working <br />area to the area shown on Appendix B. The surrounding area must <br />be kept clear for emergency vehicles, prisoner transfers, and <br />other Public Safety activities. <br />At 1331 South Ham Lane, the Contractor shall confine the working <br />area to the immediate area around the Garage. Access to the <br />Garage doors shall be kept open. Arrangements for storage, <br />parking, and other activities shall be made with the Equipment <br />Maintenance Supervisor. <br />6-05.02 (deleted) <br />6-05.03 Building Permits The work to be done under this <br />project requires a Building Permit issued by the City of Lodi <br />Building Division. The Contractor shall obtain the necessary <br />permits. All plan check, permit, and City fees will be paid by <br />the City. <br />6.3 <br />TANK6/TXTW.02M <br />
The URL can be used to link to this page
Your browser does not support the video tag.