Laserfiche WebLink
t <br /> �F <br /> i <br /> , S <br /> ROSS ASSOClA&M t <br /> BUILDING <br /> 08-4 B-50 <br /> 4 <br /> N <br /> ��/ �j <br /> IaPDaal,atla} <br /> O MW-2 0 -- 10 20 FT, <br /> 54.25 <br /> tL-li. ' <br /> uKCFADED■cAsocrn+� ; L-4 WEED orc B-6° , <br /> rANrf ; rANx <br /> ~ SJM82/A! _--- SJMBI/A� <br /> BH31 SJ681/9 r <br /> B-3 0 �. <br /> V 1.- <br /> i <br /> ``ee <br /> I <br /> MWS' <br /> t <br /> 054.11 EXPLANATION � r� <br /> "Concrete pad <br /> PORCH SHACK m MW-1 Haoitorilt3 Wall location M4 rambec �e <br /> 54.0 Top of easing elevation, <br /> feet above mean sea level <br /> o B-1 n SJMB2:A Sail boxing Location and aadaer r <br /> ------------------_ L.I (Pheae 1) ' <br /> H Oil-IA FORAIWArEa Concre)e d <br /> H-011-IB A oil U ; Soil boring location and number <br /> NX <br /> , H-Cil-2A <br /> MRw-3O --""""'-"'-"" H-01-2B BH31 Sail boring location and number <br /> 54.05 <br /> 0 4 (Phase 3) <br /> B-.L <br /> A H-Oil-IA Sail boring location and ounber <br /> (Phase 4) <br /> d <br /> `t <br /> Figure 2. Monitoring Well and Soil Boring Locations <br /> { <br /> 1 S.c <br /> f <br /> T �': <br />