Laserfiche WebLink
Messrs. Shareghi and Teed-Bose - 2 - 17 July 2007 <br /> b. Total Kjeldahl nitrogen. <br /> c. Chlorine. <br /> 6. Please clarify Figure 3, Monitoring Well Construction Detail, by addressing the following: <br /> a. The workplan text describes the wellhead as above ground completion but the figure <br /> is not consistent with that. <br /> b. The bottom cap is not identified as a screw cap. If a slip cap is used it must be <br /> secured with stainless steel screws. Please add a comment to the figure. <br /> c. The text describes placement of bollards but they are not shown on the figure. <br /> d. The material surrounding the wellhead is not identified as concrete. Using cement <br /> to set the wellhead is not acceptable; therefore, please show the material as <br /> concrete. <br /> The workplan is approved on the condition that the above comments are addressed in an <br /> addendum letter to be submitted prior to installation of the wells. If you have any questions on <br /> this conditional approval, please telephone me at (916) 464-4616. <br /> TIMOTH R. O'BRIEN <br /> Waste Discharge to Land Unit <br /> cc: Margaret Lagorio, San Joaquin County Environmental Health Department, <br /> Stockton <br /> Jason Preece, C.E.G., Engeo Incorporated, Ripon <br /> W\Std110bdepTSau JoaqulnWoumeln xa:e\snvegni 13 July 07 do <br />