My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CARNEGIE
>
555
>
2900 - Site Mitigation Program
>
PR0505723
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 12:31:03 PM
Creation date
2/22/2019 11:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0505723
PE
2950
FACILITY_ID
FA0006962
STREET_NUMBER
555
STREET_NAME
CARNEGIE
STREET_TYPE
ST
City
MANTECA
Zip
95337-6102
APN
22119064
CURRENT_STATUS
01
SITE_LOCATION
555 CARNEGIE ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/07/95 12:03 FAX 615 0 4505 OLIN-EAD Chas • a004/010 <br /> 06-06-1995 11:47RM FROM OIT MANTECA, CR TO 16153364505 P.04 <br /> 2 Certain specific raised concrete equipment pads between the north <br /> wall of the building and boundary walls of the wastewater treatment <br /> vault and bulk chemical storage areas, as shown on pg •biU t A-1. <br /> B. HVAC Systems and Equipment <br /> Landlord Responsibilities. <br /> 1. Provide heating, ventilation, air conditioning (HVAC) to the Leased <br /> Premises via units identified below as dedicated exclusively for <br /> Tenant's use. The following equipment is included: <br /> Chillers: <br /> CH-1 210 tons <br /> Air Handlers: <br /> AH-1 cafeteria <br /> AH-3 restrooms <br /> AHU-6 35,000 cfm <br /> AHU-7 3,750 cfm <br /> AHU-8 2,730 cfm <br /> AHU-9 2,140 cfm <br /> AHU-11 12,000 cfm <br /> AHU-12 3,000 dm <br /> AHU-14 3,000 cfm <br /> AIU-15 1,350 cfm <br /> Heat Pumps. <br /> A/C-1 cafeteria <br /> A/C-2 restrooms <br /> 2. All major system components including fans, pumps, haters, valves, <br /> compressors and control systems will be functionally tested and made <br /> fully operational prior to the Commencement Date. <br /> 3. All filters will be replaced prior to the Commencemert Date. The <br /> Tenant will be provided with a list of applicable filter tyrzes and sizes. <br /> 4. The Landlord will be responsible for the maintenance of all HVAC <br /> systems and components. This includes routine inspections,preventive <br /> maintenance,and the repair/replacement of major system components <br /> such as fans, pumps and one chiller (CH-1). A second 210 ton chiller <br /> CH-2 shall be utilized by Landlord at Landlord's discretion for parts <br /> and replacement items potentially necessary to maintain CH-1 noted <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.