Laserfiche WebLink
V. Personnel Changes <br /> Mr. Tom Murray has been transferred to a Marley <br /> Construction site because of schedule problems. <br /> Replacement will be selected in the near future. <br /> VI. Schedule <br /> Revised schedule, dated Feb. 2, 1987, is attached. <br /> Sincerely, <br /> THE MARLEY COOLING TOWER COMPANY <br /> CA) . <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB: mhr <br /> cc: Mr. Robert Fujii -CRWQCB <br /> Mr. Marvin Young-EPA <br /> Ms. Jeanine Jones-DOHS <br /> Ms. Laurie Cotulla-S. J. L. H. D. <br /> Mr. Larry Schaper-Black & Veatch <br /> Mr. Thomas Hickey-Black & Veatch <br /> Mr. Peter Quinlan-Hargis & Assoc. <br /> Mr. Richard Landon-MCTC <br /> Mr. Wayne Struchtemeyer-MCTC <br /> Mr. Tim Verhagen-TMC <br /> Mr. Hal Daley-MCTC, Stockton <br />