My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:06:16 PM
Creation date
2/22/2019 2:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLACK & VEATCH • <br /> MEMORANDUM Page 2 <br /> Marley Cooling Tower Company B&V Project 11654.682 <br /> Stockton, California Facility April 15, 1991 <br /> Preconstruction Conference Minutes <br /> Subsurface Soil Flushing System <br /> Phase I Construction <br /> II. ADMINISTRATIVE ITEMS (continued) <br /> Mr. Willis advised all attendees that all site personnel should <br /> register their arrival to and departure from the facility each day at <br /> MCTC' s South Yard guard station. <br /> Mr. Willis requested that all site personnel recognize the importance <br /> of maintaining a clean and safe construction site environment. <br /> Mr. Calestini requested that shipment of materials and supplies for <br /> construction activities should be addressed to MCTC's Stockton facility <br /> in care of the installation contractor or subcontractor. <br /> Mr. Willis indicated that appropriate waste disposal of wastes <br /> generated during construction were the responsibility of Layne. <br /> Mr. Willis also indicated that Mr. Jason Wong, MCTC' s Environmental <br /> Coordinator would be responsible for assisting Layne personnel with the <br /> administrative aspects of shipping hazardous waste materials to offsite <br /> disposal facilities. <br /> Mr. Willis indicated that Mr. Mike Williams was authorized and <br /> responsible for considering appropriate field change orders during <br /> construction activities. Mr. Willis said that Mr. Williams would <br /> supplement verbal change order requests with written change order <br /> documentation when appropriate. <br /> Mr. Willis advised all attendees that Mr. Williams would conduct <br /> project construction meetings as necessary and that Layne' s Project <br /> Safety Officers would conduct daily health and safety meetings for site <br /> personnel . <br /> III. HEALTH AND SAFETY <br /> Mr. Mike Williams indicated that in accordance with the site specific <br /> health and safety plan prepared by Kleinfelder, Level C personal <br /> protective equipment (PPE) would be initially required throughout <br /> drilling and trenching activities. Mr. Williams advised all site <br /> personnel that modifications to PPE or the air monitoring plan would <br /> require the approval of Mr. Thomas Hickey, B&V Project Manager. <br />
The URL can be used to link to this page
Your browser does not support the video tag.