Laserfiche WebLink
BLACK & VEATCH • • <br /> MEMORANDUM Page 3 <br /> Marley Cooling Tower Company B&V Project 11654.682 <br /> Stockton, California Facility April 15, 1991 <br /> Preconstruction Conference Minutes <br /> Subsurface Soil Flushing System <br /> Phase I Construction <br /> III. HEALTH AND SAFETY (continued) <br /> Mr. Tracy Collings indicated that MCTC's existing emergency eye wash <br /> and shower south of the wood treating building was available and <br /> operable for site personnel . <br /> Mr. Collings advised MCTC Stockton personnel that MCTC employee use of <br /> the break room and restroom in the wood treating building may need to <br /> be restricted during construction activities. <br /> Mr. Collings also identified the following site specific health and <br /> safety requirements: <br /> - Two days of breathing zone samples will be collected from air <br /> monitoring pumps worn by the driller and Mr. Williams. 24 <br /> hour turnaround analyzes of the samples would be performed by <br /> Data Chem. <br /> - Hearing protection will be required within 50 feet of the <br /> drill rig during drilling activities. <br /> - Daily tailgate health and safety meetings will be conducted <br /> by Mr. Collings or Ms. Sandra Trower. <br /> Ms. Trower indicated that Layne's health and safety plan was developed <br /> to supplement the Kleinfelder plan. Ms. Trower requested assistance <br /> with specifying within Layne's plan the specific conditions that would <br /> be required before downgrading PPE would be considered and the <br /> appropriate air monitoring to be conducted after PPE is downgraded. <br /> Mr. Collings indicated that if site personnel were authorized to <br /> downgrade PPE, Level C may be required as appropriate due to either <br /> variable site conditions or weather conditions. <br /> Mr. Collings advised Mr. David Branham that the drill crew may be <br /> required to suppress dust emission by installing a curtain or cyclone <br /> shroud device if dust and wind conditions warrant dust suppression. <br />