My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:06:16 PM
Creation date
2/22/2019 2:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 OPERATING DESCRIPTION <br /> 2. 1 CONSTRUCTION OF SUBSURFACE SOIL FLUSHING SYSTEM <br /> Implementation of the subsurface soil flushing system will be a phased <br /> process as outlined below: <br /> Phase I Construction of Pilot Flushing System. <br /> Phase II Conduct and Evaluate Pilot Study. <br /> Phase III Construction of Full-Scale Flushing System. <br /> Phase IV Long-Term Flushing System Operation and Monitoring. <br /> Construction details for the subsurface soil flushing system are provided <br /> in MCTC's Contract No. 13 plans and specifications. MCTC will select a <br /> contractor to perform the Phase I and Phase III construction activities <br /> described in the following subsections. MCTC, Black & Veatch, and a <br /> specialized subcontractor will be responsible for various activities <br /> during Phases II and IV as discussed in Section 2.2. <br /> 2.1.1 Phase I Construction of Pilot Flushing System <br /> The pilot flushing system will be constructed at the southwest corner of <br /> the retort pit as shown on Figure 1-2 and will consist of the following <br /> components: <br /> • Two vertical injection wells. <br /> (screened intervals from 20 feet to approximately 70 feet below <br /> land surface (bls) as determined by the lithology and the <br /> existing water table elevation data from monitoring wells MW-206 <br /> and MW-214) <br /> • Six neutron probe monitoring tubes. <br /> (Installed to 20 feet below the ground water table encountered <br /> at the time of drilling. ) <br /> • Injection water supply piping. <br /> (temporary water supply from city water service) <br /> • Extracted water supply piping. <br /> (temporary discharge piping to MW-214 effluent piping system) <br /> Injection water supply for the pilot system will be provided by a gravity <br /> system that utilizes a small tank or drum to store water obtained from the <br /> city water service. The extracted water piping from MW-206 to MW-214 will <br /> be used throughout the pilot study activities at the site. The extracted <br /> water piping system from MW-214 is routed to an electrochemical water <br /> treatment system at the facility that was installed under MCTC Contract <br /> No. 9. <br /> 11654.652 P-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.