My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:06:16 PM
Creation date
2/22/2019 2:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2A - WELLS, MONITORING TUBES, AND LYSIMETERS <br /> 2A-1. GENERAL. This section covers the detailed requirements of the <br /> work for installation of injection wells, monitoring tubes, lysimeters, <br /> and one extraction well for the soil flushing systems. <br /> The Work to be performed under this Agreement involves the installation <br /> of eleven injection wells, twelve monitoring tubes, two lysimeter <br /> clusters (with two lysimeters per cluster) , and one extraction well . <br /> The Work shall be performed in two phases, designated as Phase I and <br /> Phase III. Phase I will include the installation of two injection wells <br /> and six monitoring tubes. Phase III will include the installation of <br /> nine injection wells, six monitoring tubes, two lysimeter clusters, and <br /> one extraction well . During Phase II , a pilot test will be performed by <br /> the Engineer and Owner' s agent to verify the full-scale design. The <br /> number and construction details of wells, monitoring tubes, and <br /> lysimeters to be installed during Phase III will be modified as <br /> appropriate based on the results of the pilot test. The Work to be <br /> performed by the Contractor based on the current program is itemized in <br /> Tables 2A-1 through 2A-4. The locations of the Phase I and Phase III <br /> wells, monitoring tubes, and lysimeters are shown on Drawings G-1 and <br /> G-2. <br /> Figure 1-2A shows a geologic section through several monitoring wells at <br /> the site. Detailed boring logs are available from the Engineer upon <br /> Contractor's request. <br /> Penetration of asphalt or concrete paving shall be required at each <br /> well , monitoring tube, and lysimeter location. <br /> The Work under this Agreement shall include the following: <br /> Providing all field supplies. <br /> Drilling borings for all wells, monitoring tubes, and lysimeters <br /> using one or more drill rigs that are capable of performing the <br /> dual-wall reverse circulation drilling method using air as the <br /> drilling fluid and the hollow-stem auger method, in accordance <br /> with the location, type, depth specified herein, or as required by <br /> the Engineer. <br /> Backfilling with grout, borings which are not completed as wells, <br /> monitoring tubes, and lysimeters, as specified herein or as <br /> required by the Engineer. <br /> Furnishing and installing casing and screen for monitoring tubes, <br /> injection wells, lysimeters and the extraction well in accordance <br /> with the type and depth specified herein, or as required by the <br /> Engineer. <br /> (MARLEY SSFS ) 2A-1 <br /> (CONTRACT NO. 13) <br /> (11654.652 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.