Laserfiche WebLink
injection wells, lysimeters and extraction well may be drilled using <br /> either method, as approved by the Engineer. <br /> The water level in each boring shall be maintained whenever drilling <br /> equipment is retracted in preparation for sampling to avoid unbalanced <br /> hydrostatic pressure that might wash in material from the sides and <br /> bottom of the boring. <br /> 2A-3. DUAL-WALL REVERSE CIRCULATION DRILLING. Dual-wall reverse <br /> la <br /> circution drilling shall include earth drilling and sampling. All <br /> borings completed using the dual-wall reverse circulation method shall <br /> be drilled vertically. Split barrel and thin-walled tube sampling shall <br /> be performed in accordance with the requirements of Section 2A-5. Dual- <br /> wall reverse circulation drilling shall be performed as required to <br /> satisfy the requirements for advancing the boring and cleaning the <br /> borehole for each sampling procedure. <br /> Borings for the vertical injection wells shall have a minimum outside <br /> diameter of 9 inches. The boring for extraction well EW-2 shall have a <br /> minimum outside diameter of 12 inches. Borings for the monitoring tubes <br /> shall have a maximum outside diameter of 5-1/2 inches or larger if <br /> approved by Engineer. The Contractor shall be prepared to use the 6-5/8 <br /> inch dual-wall size for installation of the monitoring tubes if directed <br /> to do so by the Engineer. The borings for the lysimeters shall have a <br /> minimum outside diameter of 6-5/8 inches. <br /> The drilling equipment and materials required to perform the dual-wall <br /> reverse circulation drilling shall be decontaminated. <br /> Grease and other lubricants shall not be used, unless approved by the <br /> Engineer, on the drill casing, drill rods, sampling equipment, or on <br /> tools required to perform the dual wall reverse circulation drilling. <br /> In silty formations which might be disturbed by side discharging bits, <br /> the hole shall be prepared for split barrel sampling with a bit equipped <br /> with baffles to deflect the air upward. <br /> Air used during drilling to remove the soil cuttings shall be filtered <br /> to remove organic contaminants from the air prior to the air entering <br /> the boring. A minimum of two air filtering devices shall be provided in <br /> the air supply line. Certification of the absence of organics in the <br /> air shall be provided to the Engineer upon Engineer's request. <br /> Water to aid the drilling may be added to the air used for drilling only <br /> when approved by the Engineer. The water added shall be potable and <br /> shall come from a source approved by the Engineer. Water shall not be <br /> added to the monitoring tube borings. <br /> 2A-4. HOLLOW-STEM AUGER DRILLING. Hollow-stem auger drilling shall <br /> include earth drilling and sampling. Injection wells IW-6, 7, and 8 <br /> (MARLEY SSFS ) 2A-3 <br /> (CONTRACT NO. 13) <br /> (11654.652 ) <br />