Laserfiche WebLink
• <br /> TABLE 2. MCTC GROUNDWATER COLLECTION <br /> SYSTEM SCHEDULE <br /> DATE EVENT <br /> August 26 - Construction of South Yard <br /> September 6, 1991 groundwater collection force <br /> main and railroad casing. <br /> September 9 - 23, 1991 Installation of pumping station <br /> and offsite well vaults. <br /> September 23 - Construction of North Yard piping. <br /> October 4, 1991 <br /> September 23 - Installation of control cabinets, <br /> October 15, 1991 system wiring, and supervisory <br /> control and data acquistion <br /> (SCADA) system. <br /> October 21, 1991 Inspection and checkout. <br /> December 4, 1991 Full-scale startup of groundwater <br /> collection system. <br /> MCTC GROUNDWATER COLLECTION SYSTEM SCHEDULE <br /> B&V Project M 11654.683 <br /> CAW25G:GWSCHED.WK7 <br /> 08/26/91 <br />