Laserfiche WebLink
S W RCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page 7 of <br />Test Method Developed By: ❑ Sump Manufacturer O Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum O Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: TS -STS <br />Equipment Resolution: 0.00" <br />Su►np # 91 Sump # 87-1 <br />Sump # 87-2 Sump # 87 slave <br />48.00" <br />48.00" <br />Sump Diameter: 48.00" 48.00" <br />Sump Depth: <br />72.00" <br />72.00" <br />72.00" <br />72.00" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />18.00" <br />18.00" <br />18.00" <br />18.00" <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />40.00" <br />40.00" <br />40.00" <br />40.00" <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Clean dry <br />Clean dry <br />Clean dry <br />Clean dry <br />Portion of Sump Tested' <br />Highest penetration <br />Highest penetration <br />Highest penetration <br />Highest penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />❑ Yes ❑No ONA <br />❑Yes ❑No ONA <br />❑Yes []No ONA <br />[]Yes []No ONA <br />product and water)?* <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />❑Yes ❑No ONA <br />❑Yes []No ONA <br />[]Yes ❑No ONA <br />[]Yes ❑No ONA <br />shutdown?` <br />Was fail-safe verified to be <br />operational?* <br />❑Yes ❑ No O NA <br />❑Yes ❑ No O NA <br />❑Yes ❑ No O NA <br />❑Yes ❑ No O NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />5min <br />5min <br />5min <br />5min <br />test: <br />Test Start Time: <br />Initial Reading (Rl): <br />SEE INCON RESULTS <br />SEE INCON RESULTS <br />SEE INCON RESULTS <br />SEE INCON RESULTS <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />15 min <br />15 min <br />15 min <br />15 min <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or Criteria: <br />0.002" <br />0.002" <br />0.002" <br />0.002" <br />Test Result: <br />O Pass ❑ Fail <br />O Pass ❑ Fail <br />O Pass ❑ Fail <br />O Pass ❑ Fail <br />Was sensor removed for testing? <br />O Yes ❑No [INA <br />OYes []No [INA <br />OYes ❑No [INA <br />OYes ❑No ONA <br />Was sensor properly replaced and <br />❑' Yes ❑No []NAOYes <br />[]No ONA <br />OYes 0 N 0 N <br />E] Yes ❑No [I NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />