Laserfiche WebLink
� w <br /> LEVINE•FRICKE <br /> Borings will be backfilled with neat cement grout or hydrated <br /> bentonite pellets under the ispection of a County of San <br /> Joaqin representative. Soil cuttings will be stockpiled on <br /> site. <br /> Schedule <br /> Soil sampling and pressure washing are scheduled to take place <br /> during the week of June 22, 1992 . Ron Goloubow of <br /> Levine•Fricke will contact you at least one week before <br /> sampling begins. We will provide you with a copy of the <br /> Health and Safety Plan for your information before the work <br /> begins. <br /> If you have any questions regarding this letter or the project <br /> in general, please call me or Ron Goloubow. <br /> Sincer ly, r <br /> Mark D. Knox, P.E. <br /> Chief Engineer <br /> cc: Denise Saterlee, Great Western Richmond <br /> Lee Zimmerli, Great Western Portland <br /> 2617\COMNLET:CdH 2 <br />