12: 'P9 FRUM HLHNU TU 12094640138 P-04 <br /> 0. Schedule. There is no information pertaining; to schedule accept to indicate that a <br /> ra.port will be prepared within 8 weeks after QQmpjotjari of the fjgtd work. This seems <br /> ntirely too long. The overall sebedule could take up to around 12 weeks after the work <br /> Ian is approved barring any weather problems. UNOCAL must provide the SJCP-HD and <br /> B a bar chart indicating all milestones as a function of tasks (e.g., permits, borings and <br /> ell installation, sampling and analysis, disposal of spoils, report preparation, etc.). <br /> i <br /> I <br /> I <br /> 1 <br /> 4- <br /> TBTHL F.04 <br /> i <br /> 1 <br /> 1 <br />