My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
440
>
2900 - Site Mitigation Program
>
PR0536618
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 3:41:55 PM
Creation date
3/1/2019 3:04:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0536618
PE
2960
FACILITY_ID
FA0021026
FACILITY_NAME
STOCKTON CHARTER WAY COMMON PLUME
STREET_NUMBER
440
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
440 Charter • Page 1 of 2 <br /> Lori Duncan [EH] <br /> From: Murphy, Mike [mmurphy@cambria-env.com] <br /> Sent: Friday, November 10, 2006 11:01 AM <br /> To: Lori Duncan [EH] <br /> Subject: RE: 440 Charter <br /> Lori, <br /> You are correct. Each screen interval/depth has three chambers-one for DTW readings, one for sampling, and a <br /> spare chamber. This is spelled out on Blaine's scope of work sheet that the sampling techs are supposed to be <br /> following. I'll make sure Blaine follows these procedures in the future. <br /> Thanks, <br /> Mike <br /> Mike Murphy <br /> Senior Project Scientist <br /> Cambria Environmental Technology, Inc. <br /> 270 Perkins Street, Sonoma, CA 95476 <br /> Phone: 707.933.2367 <br /> FAX: 707.935.6649 <br /> Cell: 510.385.3116 <br /> A Woman-Owned Business <br /> This e-mail may contain conridential and privileged material for the sole use of the intended recipient.Any review or distribution by <br /> others is strictly prohibited.0 you are not the intended recipient please contact the sender and delete all copies. <br /> From: Lori Duncan [EH] [mailto:lduncan@sjcehd.com] <br /> Sent: Tuesday, October 31, 2006 9:53 AM <br /> To: Murphy, Mike <br /> Subject: 440 Charter <br /> Mike, thanks for returning my call. I decided to respond by email as my question is perhaps a bit convoluted. <br /> There are two multi-chambered wells at this site made of CMT tubing, MW-18-80/MW-18-120 and MW-11- <br /> 80/MW-11-122. Last quarter the depth to water measurements in the MWA 1 wells were off approximately 5-6 <br /> feet from all other DTW's in wells with similar screen intervals. Yesterday at the 4th quarter QM I spoke with the <br /> Blaine-Tech guys about how they measure, etc. Yesterday the DTW's in the MW-11 wells were not off from the <br /> rest of the wells, so no telling what happened last quarter. <br /> My question is this: The CMT tubing has seven channels inside of it, each of which can be used as a well. I <br /> seem to recall that when those wells were installed I was told that each depth interval actually had three channels <br /> of the tubing drilled, plugged and screened for use as a well, ie: three 80-foot wells and three 120-foot wells. The <br /> idea behind this was to have one channel open to tag DTW, one channel to keep the dedicated tubing that is <br /> used for purging in, and a spare. Do you know of, or can you find any supporting documentation for this? <br /> I checked my field notes in the file and I made no notation of it; I checked the well installation report and <br /> boring/well logs and could find nothing there either. It is entirely possible that I am confusing this site with <br /> another, but I have few of these wells. I do know that these wells were pre-built and delivered to the site in a roll <br /> all ready to be installed, so I was thinking that Cambria may have the exact as-built specifications on an order <br /> form or invoice, perhaps? <br /> 11/13/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.