My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 1:15:01 PM
Creation date
3/4/2019 11:20:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 6 <br />Chevron U.S.A. Products Co. -2- MAY 24 2;` l(' <br />investigative workplan/Corrective Action Plan (CAP) before performing any work. This phasing process <br />and the workplan/CAP requirements were intended to: <br />help the responsible party undertake the necessary corrective action in a cost-effective, efficient and <br />timely manner; <br />2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br />alternative before any corrective action work was performed; and <br />3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br />the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br />the environment. <br />In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br />hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br />interim remedial action after: (1) notifying the regulatory agency of the proposed action, and; (2) <br />complying with any requirements that the regulatory agency may set. Interim remedial action should only <br />be proposed when necessary to mitigate an immediate demonstrated hazard. Implementing interim <br />remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br />effective corrective action alternative. <br />Three bids and Cost Preannroval: Only corrective action costs required by the regulatory agency to <br />protect human health, safety and the environment can be claimed for reimbursement. You must comply <br />with all regulatory agency time schedules and requirements and you must obtain three bids for any <br />required corrective action. Unless waived in writing, you are required to obtain preapproval of costs for <br />all future corrective action work Ifyou do not obtain three bids and cost preapproval, reimbursement <br />is not assured and costs may be rejected as ineligible. <br />If you have any questions, please contact me at (916) 227-4411. <br />Sincerely, <br />Sandy Gill <br />Claims Review Unit <br />Underground Storage Tank Cleanup Fund <br />cc: Mr. Gordon Boggs Ms. Margaret Lagorio <br />RWQCB, Reg. 5 - Sacramento San Joaquin County EHD <br />3443 Routier Road P.O. Box 2009 <br />Sacramento, CA 95827-3098 Stockton, CA 95201 <br />CaGloraia Ea viroumental Protection Agency <br />P.d Recyc/edPepec <br />
The URL can be used to link to this page
Your browser does not support the video tag.