Laserfiche WebLink
N <br /> N <br /> Roger Liston Page 2 <br /> The TRC discussed the need for a municipal well survey of the area . Although the <br /> site is not ready for closure , a well survey may explain the apparent estimated <br /> velocity of 24 feet per year for this plume . <br /> Installation of the Vapor Extraction System (VES) wells is considered an interim <br /> corrective action and does not require a corrective action plan . PHS/EHD requires a <br /> compliance date of April 1996 for the installation of the VES wells . A registered civil <br /> engineer shall design the VES wells. A corrective action plan as described in Article <br /> 11 of the CCR shall be submitted to PHS/EHD by June 21 , 1996 . The corrective <br /> action plan will address remediation of the offsite portion of the plume and the portion <br /> of the onsite plume not addressed in this interim corrective action . <br /> For additional information please contact Steven Sasson , Senior REHS , at (209) <br /> 468-3459 . <br /> Donna Heran , REHS , Director <br /> Environmental Health Division <br /> i <br /> Steven Sasson , Senior REHS Diane M . Hinson , REHS <br /> Site Mitigation Unit Supervisor <br />€ SS <br /> cc: Elizabeth Thayer - CVRWQCB <br /> Annabel Mackey - SWRCB <br /> John Cussen - California Geophysical Group <br /> Maryrose Petrizzo - Pep Boys <br /> P . Jerold Walsh - Cox, Castle and Nicholson <br /> Howard Shook - Benito Tank Lines <br /> Khaldoon Othman- K & S Gas and Grocery <br /> William Hunter - Hunter and Associates <br /> Frank Morita - Morita Brothers <br /> I <br />