Laserfiche WebLink
Page_�of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: UDC Manufacturer O Industry Standard ® Professional Engineer ❑ <br /> Other(Specify) <br /> Test Method Used: Pressure ❑ Vacuum ❑ Hydrostatic ❑ <br /> Other(Spec) <br /> Test Equipment Used: Wayne Perry Inc. See Attached Testing Results Equipment Resolution: .()(X)()7 <br /> Under-Dispenser Containment Number Below <br /> .. `t? �� + <br /> UDC Manufacturer: �vTLa`t%ihsi�nl <br /> UDC Material: <br /> UDC <br /> — <br /> UDC Depth: <br /> Height from UDC Bottom to Top a <br /> of Highest Piping Penetration: 1xj .., i-'t <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to � J <br /> testing: <br /> Portion of UDC Tested' 2"Above Highest 2"Above Highest 2"Above Highest 2"Above Highest <br /> Penetration Penetration Penetration Penetration <br /> Does turbine shut down when ❑ Yes❑ No NA® O Yes❑ No NA® ❑Yes❑ No NAN ❑ Yes❑ No NA® <br /> UDC sensor detects liquid. <br /> Turbine shutdown response time ❑ Yes❑ No NAM ❑Yes❑ No NA® ❑Yes❑ No NA® ❑Yes❑ No NA® <br /> Is system programmed for fail- ❑ Yes❑ No NA® ❑Yes❑ No NA® ❑Yes❑ No NA® O Yes❑ No NA® <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑ Yes❑ No NA® ❑Yes❑ No NA® ❑Yes❑ No NA49 ❑Yes❑ No NA® <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes5 Minutes 15 Minutes <br /> starting test .1 )` . <br /> Test Start Time: 1 5W <br /> Initial Reading(RD: Z„31"14 /z-G.14fi <br /> Test End Time: 1L3 •5� <br /> Final Reading(RF): 1 z,54 a /Z66�6 <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min 15 in 15 Min 15 Min 15 Min <br /> Change in Reading(RF-RO: (nollz 3 1000117- <br /> Pass/Fail Threshold or Criteria: -0. 0 -0. 20 -0-0920 -0. -0.0020 -0.0020 -0.0020 -0.0020 <br /> Y _ <br /> Was sensor removed for testing? ❑ es No NAE] ❑Yes O No NAE] - ❑Yes❑ No NAE] ❑Yes O No NAO <br /> Was sensor properly replaced and ❑ Yes❑ No NAE] ❑Yes❑ No NA❑ ❑Yes❑ No NAE] ❑ Yes❑ No NAD <br /> verified functional after testing? <br /> Comments—(include information on repairs // <br /> made riorr to testing, and recommended follow-up for failed/tests) <br />