My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0038701
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
1085
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0038701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2019 8:45:15 AM
Creation date
4/26/2019 8:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0038701
PE
4373
STREET_NUMBER
1085
Direction
S
STREET_NAME
UNION
STREET_TYPE
RD
City
MANTECA
Zip
95337-
APN
22224012
ENTERED_DATE
8/24/2018 12:00:00 AM
SITE_LOCATION
1085 S UNION RD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
DAfonskaia
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GES <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> • Post-excavation confirmation sampling of the bottom and perimeter of excavations <br /> to demonstrate that soil exceeding regulatory criteria have been excavated <br /> • Collection and analysis of stockpiled soil for waste classification <br /> • Identifying a licensed disposal facility in accordance with applicable regulations, <br /> and transporting the stockpiled soil to the chosen disposal facility; and <br /> • Performing Site Restoration. <br /> In addition to the thirteen AOC, implementation of the Removal Action will include: <br /> • Sampling and removing ash from the silo and covering the foundation adjacent to <br /> Boring B-29; <br /> • Abandonment of the on-Site water supply well; <br /> • Removal and proper disposal of drums,chemical containers, cabinets, debris, <br /> buildings, and foundations remaining on-Site. <br /> A detailed discussion of field and laboratory techniques is in the Sampling and Analysis Plan <br /> ("SAP") (Appendix B). Protocols for ensuring the quality of field and laboratory data are <br /> detailed in the Quality Assurance Project Plan(Appendix C). Field activities will also be <br /> conducted in accordance with the Health and Safety Plan(Appendix D). <br /> 5.1 Site Security <br /> Currently,the Site is secured by a perimeter fence with a locked gate. However,there are <br /> gaps in the fence and evidence that people are accessing and using the Site. Prior to <br /> beginning removal and remediation activities will be enhanced by: <br /> • Repairing gaps in the perimeter fence; <br /> • Posting appropriate signage; <br /> • Replacing the gate lock; and <br /> • Hiring security (if deemed necessary). <br /> 5.2 Removal of Drums,Debris,and Buildings <br /> Prior to excavation, all remaining cabinets, debris, buildings and foundations will be <br /> removed from the Site. If drums or other containers have solids or liquids in them,these <br /> materials will be sampled and analyzed as appropriate. Other miscellaneous debris and <br /> building materials will be removed for proper off-Site disposal. <br /> During these removal activities,the soil beneath these materials will be observed and <br /> screened as appropriate. If there appears to have been a chemical release associated with <br /> Former Gordon Research Company Property 14 of 20 <br /> Removal Action Workplan <br /> June 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.