My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0038701
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
1085
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0038701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2019 8:45:15 AM
Creation date
4/26/2019 8:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0038701
PE
4373
STREET_NUMBER
1085
Direction
S
STREET_NAME
UNION
STREET_TYPE
RD
City
MANTECA
Zip
95337-
APN
22224012
ENTERED_DATE
8/24/2018 12:00:00 AM
SITE_LOCATION
1085 S UNION RD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
DAfonskaia
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GE <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> these materials,the soil beneath will be sampled as appropriate. If the soils have been <br /> impacted by COPC,then additional sampling may be performed to delineate the extent of <br /> impacts. Any additional impacted soil that is identified will be excavated and disposed of as <br /> described in the sections below. <br /> S.3 Excavation <br /> Excavation will be performed in each of the thirteen AOC to remove soil (or ash from AOC <br /> 13) impacted by the COPC as detailed in Section 3.1 and shown on Figure 3. Prior to <br /> excavation,each of the borings will be located based on their GPS coordinates reported in <br /> Arcadis(2102). After boring re-location,the perimeter of each AOC will be marked based <br /> on the dimensions shown on Figure 3. <br /> Before removing the impacted soil,vegetation in the areas to be excavated will be cut off at <br /> the ground surface, segregated, and removed from the work area. Removal of vegetation is <br /> to be performed using hand-held mechanical equipment to minimize disturbance of soil prior <br /> to excavation. <br /> The soil excavation methods will include mechanical excavation using rubber-tired or track- <br /> mounted backhoe, excavator, and loader. Soil will be excavated and stockpiled on and <br /> covered with plastic sheeting on the eastern part of the Site. During excavation, stockpiling, <br /> and loading, soil will be moistened as necessary to reduce dust generation using water trucks <br /> or hoses. Additional details for minimizing fugitive dust are included in the Dust Mitigation <br /> Plan (Appendix F). <br /> 5.4 Confirmation Sampling <br /> After excavation of impacted soil,confirmation soil samples will be collected from the base <br /> and perimeter of the excavations to confirm that concentrations of COPC in soil are below <br /> respective RAO. Soil sampling procedures are detailed in the SAP(Appendix B). For each <br /> AOC, confirmation samples will be analyzed for only those COPC that exceeded their RAO <br /> as reported in Arcadis (2012). <br /> Confirmation sampling will use the Incremental Sampling Methodology(ITRC 2012). Each <br /> AOC will be divided into 5 decision units ("DU"),with each of the 4 sidewalls and the base <br /> of the excavation as its own DU. For each DU, at least 30 incremental samples will be <br /> combined to form a single sample for each DU in each AOC. All subsequent sample <br /> processing will be performed by the laboratory. <br /> If the confirmation sample analysis indicates target cleanup levels have been attained, no <br /> further excavation will be conducted. If the analytical results of confirmation sampling <br /> indicate target cleanup levels have not been attained for a particular DU,then further <br /> Former Gordon Research Company Property 15 of 20 <br /> Removal Action Workplan <br /> June 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.