Laserfiche WebLink
i. (UM) J ES l NU <br />Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Sped,) <br />Test Equipment Used: lncon Sump Tester Equipment Resolution: +/- 0.002" <br />UDC Manufacturer: <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />-testing: <br />Portion of UDC Tested <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?' <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?* <br />Was fail-safe verified to be <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />Test Start Time: <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (R,: -RI): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />UDC # 1/2 <br />Bravo <br />Steel <br />12" <br />Located on Bottom <br />UDC # 3/4 <br />Bravo <br />Steel <br />12" <br />Located on Bottom <br />UDC # 5/6 <br />Bravo <br />Steel <br />12" <br />Located on Bottom <br />UDC # 7/8 <br />Bravo <br />Steel <br />12" <br />Located on Bottom <br />Located on Bottom I Located on Bottom I Located on Bottom I Located on Bottom <br />Good Good Good Good <br />2" above piping 1 2" above piping T 2" above piping I 2" above p <br />❑ Yes ❑ No ®NA I ❑ Yes ❑ No ®NA I ❑ Yes ❑ No ®NA I ❑ Yes ❑ No ®NA <br />N/A <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />30 minutes <br />1:16 pm <br />0.6184 <br />1:31 pm <br />0.6187 <br />15 min. <br />0.0003 <br />+1- 0.002" <br />Pass ❑ Fail <br />❑ Yes ❑No®NA <br />❑ Yes ❑ No ® NA <br />N/A <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />30 minutes <br />1:16 pm <br />1.3752 <br />1:31 pm <br />1.3747 <br />15 min. <br />0.0005 <br />+/-0.002" <br />El Pass ❑ Fail <br />❑ Yes ❑No®NA <br />❑ Yes ❑ No ® NA <br />N/A <br />❑ Yes ❑No ®NA <br />❑ Yes ❑ No ® NA <br />30 minutes <br />1:16 pm <br />1.2921 <br />1:31 pm <br />1.2927 <br />15 min. <br />0.0006 <br />+/-0.002" <br />8 Pass ❑ Fail <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑No®NA <br />N/A <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />30 minutes <br />1:16 pm <br />1.3082 <br />1:31 pm <br />1.3081 <br />15 min. <br />0.0001 <br />+/- 0.002" <br />El Pass ❑ Fail <br />❑ Yes ❑No®NA <br />❑ Yes ❑No®NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />' If the entire depth of the UDC is not tested, specify how much was tested. if the answer to anv of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />