Laserfiche WebLink
9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br />Fill Spill Box ff 87 <br />Fill Spill Box N 91 <br />Fill Spill Box #t Diesel <br />Bucket Diameter: <br />12" <br />12" <br />12" <br />Bucket Depth: <br />10" <br />10" <br />10" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 min. <br />10 min. <br />10 min. <br />Test Start Time: <br />1 l :17 am <br />11:17 am <br />11:17 am <br />Initial Reading (R,): <br />6.3009 <br />5.5662 <br />6.5852 <br />Test End Time: <br />11:33 am <br />11:33 am <br />11:33 am <br />Final Reading (RF): <br />6.3007 <br />5.5652 <br />6.5850 <br />Test Duration: <br />16 min. <br />16 min. <br />16 min. <br />Change in Reading (RF -R,): <br />0.0002 <br />0.0010 <br />0.0002 <br />Pass/Fail Threshold or <br />Criteria: <br />+/-0,002" <br />+/-0.002" <br />+/-0.002" <br />Test Result. <br />ff] Pass ❑ Fail <br />® Pass 0 Fail <br />_ _ <br />® Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />