My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
COMPLIANCE INFO 2002 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 3:00:07 PM
Creation date
5/8/2019 1:59:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2006
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
facility. No violations were noted at the time of inspection and facility was reminded that <br /> secondary containment testing was due in December 2005. <br /> On March 20, 2006, Mr. Willy Ng, Senior REHS, performed a routine UST inspection <br /> (Attachment 26) and witnessed the annual monitoring certification (Attachment 27) at this <br /> facility. Secondary containment testing was three months past due, monitoring certification, leak <br /> detector, and spill bucket testing was one month past due. Both 87 and 91 leak detectors failed <br /> to detect a 3.0 gph leak at 10 psi and a current financial responsibility had not been submitted to <br /> this office. <br /> On May 11, 2006, Mr. Ng sent a follow up letter to the facility requesting the items noted on the <br /> March 20, 2006 inspection report (Attachment 28). As of the date of this referral, a certification <br /> of financial responsibility and a return to compliance document have not been received by this <br /> office. <br /> On May 22, 2006, Mr. Ng received a secondary containment test report from Franzen-Hill Corp. <br /> for testing performed on March 22, 2006 (Attachment 29). Most of the components were not <br /> tested due to a lack of test boots. <br /> On July 10, 2006, Mr. Muniappa Naidu received a call from Vernon with Franzen-Hill Corp. <br /> Test boots were installed to complete the secondary containment testing. Mr. Naidu was told <br /> that all UDCs passed, but the piping runs failed. Mr. Ng called and left a message for Mr. Silva <br /> to call back regarding these failed test results. As of the date of this referral, a secondary <br /> containment test report has not been received by this office for these tests. <br /> On July 11, 2006, Mr. Silva called and left a message for Mr. Ng. The leak detectors were not <br /> able to detect a 3.0 gph leak at 10 psi due to damaged siphon jet valves, and were repaired <br /> "within a week." Mr. Ng received a call from Kurt from Stockton Service Station who said the <br /> siphon jet valves were replaced and the leak detectors were retested. He was not told it was due <br /> to a failure during a monitoring certification, so he did not call for an inspection. A time was set <br /> for the next day to retest with an inspection from this office. Mr. Ng called and left a message <br /> for Mr. Silva informing him that leak detectors were to be retested. <br /> On July 13, 2006, Mr. Ng witnessed testing of both leak detectors by Stockton Service Station <br /> Equipment. Both detected a 3.0 gph leak at 10 psi (Attachment 30). <br /> No known repairs have been made to the secondary containment piping runs reported by the July <br /> 10, 2006,phone call from Vernon of Franzen-Hill. <br /> 678 N. Wilson Way, Stockton, Food 4 Less <br /> On November 19, 2001, Ms. Le, Senior REHS, EHD, performed a final inspection and approved <br /> this facility to operate a UST system. Mr. Silva was issued a report (Attachment 31) which <br /> asked him to submit a financial responsibility document by December 19, 2001 and reminded <br /> Page 4 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.