My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO 2006 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2019 9:44:41 AM
Creation date
5/10/2019 4:24:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2011
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page �) of <br /> 7. UNDER-DISPENSER CONTAINMENT (UDQ TESTING <br /> Test Method Developed By: UDC Manufacturer Industry Standard ofessional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure ❑ Vacuum drostatic <br /> U Other(Spec) <br /> Test Equipment Used: Co(�!W e t I �r,,i i Equipment Resolution: ,p a 7- <br /> UDC <br /> UDC# its UDC# 1 UDC# / UDC# <br /> UDC Manufacturer: GA) 411 G✓!s�r�� <br /> UDC Material F% (uY A, s F` - l�ss / <br /> UDC Depth: 32-11 <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: /3 113 <br /> Height from UDC Bottom to p <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested Gv�t�zr Lwa s'tt W cis Lire <br /> Does turbine shut down when I <br /> UDC sensor detects liquid(both ! 'es ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes No ❑NA <br /> product and water)?* ! j <br /> Turbine shutdown response time t 4--('L. c!u dv u CI.-•<_lC,t <br /> is system programmed for fail- Yes ❑No ❑NA es ❑No ❑NA ❑Yes DNo ❑NA El Yes Nq ❑NA <br /> safe shutdown?* <br /> Was fail-safe verified to be <br /> operational?* ❑Yes );?-No ❑NA ❑Yes /r. ttio ❑NA ❑Yes q No ❑NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuu W:_ d <br /> startingtestt O r'' LA.�-.'r r d /-4 rh of-SYS <br /> Test Start Time: op ,{ <br /> Initial Reading Ri): 4-6VLG lQ s f C,jc CP <br /> Test End Time: /!.' 10 /,,3 <br /> Final Reading RF): 'f w1-e"r? C <br /> Test Duration: 3a r-er +— d/,t%D(�t-A-{S <br /> Chane in Reading(RF-Ri): ,i 0 XAO e <br /> Pass/Fail Threshold or Criteria: o o v o s 3 r. }J <br /> Test Result: Pass ❑ Fail kr Pass ❑ Fail f] Pass ❑ Flit ❑ Pass Fail <br /> Was sensor removed for testing? I�Nes ❑No is NA es E No ❑NA ❑Yes ❑No I-1 NA ❑Ves 11 No ❑NA <br /> Was sensor properly replaced and Yes Cl No ❑NA Yes ❑No ❑NA [7 Yes ❑No ❑NA ?'Yes ❑No '❑NA <br /> verified functional after testing? <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the L 1 DC is not tested, specify how much was tested. If the answer to aqy of the questions indicated with an <br /> asterisk(*) isNO"or"NA", the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.