Laserfiche WebLink
Safety Prevention Techniques <br /> Equipment and Precautionary Procedures <br /> Prior to commencement of any site extraction activities, all personnel to be involved are to <br /> be identified and briefed as to the potential hazards of the extraction as well as the <br /> hazardous materials within the tank in the form of Gasoline Compounds. <br /> All personnel involved in the process shall receive and sign for the receipt of this Site <br /> Safety Plan. <br /> All personnel involved in the process are experienced in this process and no one without <br /> experience shall be allowed to work on the same. <br /> No actions shall be taken without the immediate presence and direct supervision of the <br /> Project Manager, and/or Project Site Safety Officer. <br /> The total area involved in the extraction shall be bordered off from foot traffic and <br /> vehicular traffic via restrictive fencing, access conesibarricades, and caution tape as <br /> specified by the supervision of the Project Manager, and Project Site Safety Officer. <br /> The appropriate fire extinguishers shall be provided and present at all times. <br /> A fire watch shall be maintained by the Project Manager, and Project Site Safety Officer. <br /> No smoking or other means of open flame or open ignition shall be allowed. <br /> Prior to commencing the removal process, all possible gasoline contents shall be removed <br /> from the tank and properly stored/disposed. <br /> One-day prior to the commencing of the removal process, the tank shall be packed <br /> intemally with the proper and required amount of dry ice to suppress flammable vapors. <br /> There are telephones at the facility and the Project Manager, has access to a phone at all <br /> times. In the event of a medical emergency, the Project Manager, and/or the Project Site <br /> Safety Officer, shall render immediate first aid and then summon 911 assistance via <br /> telephone. <br /> Should such an emergency arise, the work shall be terminated immediately, and personnel <br /> shall be assigned to remain and secure the scene and an investigation shall begin to <br /> determine the probable cause of the accident. <br /> All personnel contracted for the process shall first be required to read and agree to this <br /> safety plan and monitored for compliance by the Project Manager, and Project Site Safety <br /> Supervisor. <br /> 5 <br />