My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
REMOVAL 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 1:42:27 PM
Creation date
5/15/2019 11:39:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Personal Protective Equipment <br /> Hard Hat <br /> Gloves <br /> Long Pants <br /> Long Sleeved Shirt <br /> Protective Goggles/Glasses <br /> Note: During the process of air monitoring, should the levels rise to or exceed 300 ppm, <br /> under the direction and discretion of the Project Manager, and/or the Project Site Safety <br /> Officer, all personnel will be required to enter into level 'C' protection. <br /> Air Monitoring Safety <br /> An H Nu properly calibrated shall be available if the Project Manager deems it necessary, <br /> and monitored by the Project manager. A Gas Tech currently calibrated monitor shall be <br /> displayed to the Fire Marshal representative present for approval prior to usage and said <br /> official shall be afforded full and complete inspection/monitoring or usage at the time of <br /> the product line removal. <br /> The work shall only take place during the light of day and not take place in darkness at <br /> any time. <br /> Decontamination Procedures <br /> Any person coming in contact with the petrohydrocarbon chemical(s) shall receive <br /> immediate and extensive cleaning in a rinse of clean water. <br /> Saline solution shall be immediately and extensively applied to eyes exposed.Skin shall be <br /> immediately treated with the appropriate ointment and wrapped with sterile gauze. <br /> The immediate decontamination to be used to decontaminate clothing or equipment shall <br /> be; TriSodium Phosphate and any decontamination fluids expended in the process shall be <br /> collected and properly disposed of and not allowed to enter the ecological system when at <br /> all possible. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.