My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012568
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1521
>
3500 - Local Oversight Program
>
PR0544466
>
ARCHIVED REPORTS XR0012568
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 3:59:43 PM
Creation date
5/16/2019 3:02:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012568
RECORD_ID
PR0544466
PE
3528
FACILITY_ID
FA0005303
FACILITY_NAME
HOLT OF CALIFORNIA
STREET_NUMBER
1521
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337015
CURRENT_STATUS
02
SITE_LOCATION
1521 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
744
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii <br /> o The remaining annular space will be filled to the ground <br /> surface with a bentonite/cement grout. The grout will <br /> be placed in the annular space using the tremmie method <br /> of placement, and will be allowed to set for 24 hours <br /> prior to well development. <br /> o Wells will be completed at grade with a locking cover <br /> and Christie box, which will be grouted in place at the <br /> ground surface to complete installation. <br /> o The elevation of the top of the well casing will be <br /> surveyed to the nearest 0.01 foot by a licensed surveyor. <br /> o Development water, decontamination rinse dater, and <br /> cuttings will be collected and contained in a baker tank <br /> or by other appropriate means for onsite treatment <br /> through biodegradation or other recognized treatment <br /> process. <br /> The proposed well construction details of the monitoring wells <br /> are shown in Figure 3, <br /> 2.2.5 Well beveiopmgp_t <br /> The purpose of well development is two-fold: to repair <br /> formation damage caused by drilling so that natural hydraulic <br /> properties are restored, and to develop better flow of water to <br /> the well. Wells will be developed using a combination of bailing, <br /> swabbing, and pumping with a centrifugal or submersible pump until <br /> sediment fee water is pumped from the well. <br /> 2.2.6 Water Level Measurem�t <br /> Static water level measurements for each monitoring well, new <br /> and existing, will be taken and ceferenced to the top of the <br /> casing. The wetted tape method or electric sounder method will be <br /> used to take the measurement to the nearest 0.01 foot. sounder <br /> cable or tape will be decontaminated before and after each well. <br /> Should floating product be found on the surface of the water table <br /> during the measurement, oil/water indicator pastes or an oil/water <br /> interface probe will be used to determine the location of the water <br /> table: and the depth of the floating product. <br /> 2.2.7 Grgund Water Sample Col a t'o <br /> Prior to ground water sampling, specific conductance, <br /> temperature and pH will be measured. A pH meter with a combination <br /> gel-filled electrode or equivalent, will be used for field pH <br /> - determinations. A combination electrical conductivity-temperature <br /> or equivalent measuring devices will be used for determination of <br /> conductivity and temperature. All instruments will be calibrated <br /> LD01.064 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.