My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:32:09 PM
Creation date
5/20/2019 9:17:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO ā(ARCO)ā NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S P E C I A L P R O V I S I O N S <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company (permittee) shall furnish <br /> full-time supervision of all work to insure full compliance <br /> with the permit provisions. <br /> 2 . START OF WORK: No work within the County right of way shall <br /> Iā <br /> e starte until the utility company representative has made <br /> an evaluation of weather conditions and has determined the <br /> work can be accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT : Dirt and mud shall not be deposited as the <br /> pavement outside the area of work, and if inadvertently--track- <br /> ed onto the road travelway shall be removed immediately. <br /> 4 . DAILY RESTORATION: Private driveways and road intersections < <br /> shall be restare7 daily. <br /> 5. WEATHER-TIGHT CONDITION: All trenches shall be filled and <br /> compacted, ditches an other drainage facilities regraded <br /> and opened, and the entire work area restored to weather- <br /> tight condition prior to any rain. <br /> Engineering Sen ices Utilitv lCork Special Provi5ions Fonn 36 (5/79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.