Laserfiche WebLink
U <br /> CLUSTER WELL SET 8A AND 8B <br /> The A zone well will be drilled north of former well MWl, which was destroyed prior to the over- <br /> excavation of contaminated soils. A limited access rig will be necessary due to overhead power <br /> lines. MW 8A will be drilled approximately 12 feet north of former well MWI. Drilling will <br /> utilize 8 inch hollow stem augers with 3 foot core barrels. The borings will be cored to the 18 foot <br /> depth base of Zone A sand. Core examination will determine the proper placement of i-5—foot <br /> length of 2 inch diameter, 0.01 inch slotted PVC screen. Blank Schedule 40 threaded PVC will be <br /> used to compete well MW8A to surface. #2112 sand will be used as the filter pack across the <br /> screen from bottom of the boring to six inches above the top of slots. Once the sand is in place the <br /> well will be surged to stabilize the sand pack and if necessary more sand will be added. Two feet <br /> of hydrated bentonite will then be used above the sand as a sanitary seal. Neat cement with less <br /> than 5% bentonite will be placed on top of the bentonite seal to surface, where surface security will <br /> be provided by the placement of a 6.inch diameter by 12 inch deep traffic rated water tight traffic <br /> box secured with a concrete shoulder, see Figure 4 for well construction details. A locking thermos <br /> type well cap will be placed at the casing top to secure the monitor well. <br /> The B zone well MW8B will be drilled approximately 3 feet west of the well MW8A, see Figure 3. <br /> Drilling will be as described above, with drilling/coring to the 27 foot depth. Core examination <br /> will determine the proper placement of the 5 foot length of 2 inch diameter, 0.02 inch slotted PVC <br /> screen. Monitor well construction will be similar to that described above except #3 sand will be <br /> used, see Figure 4 for well construction details. <br /> CLUSTER WELL SET 9A AND 9B <br /> The A zone well (MW9A) will be drilled approximately 40 feet west of former probe hole P9, see <br /> Figure 3. Drilling will utilize 8 inch hollow stem augers with 3 foot core barrels. The borings will <br /> be cored to the 18 foot depth base of Zone A sand. Core examination will determine the proper <br /> placement of 5 foot len h 2�inch diameter, 0.01 inch slotted PVC screen. Blank Schedule 40 <br /> threaded PVC will be used to compete well MW9A to surface. #2/12 sand will be used as the filter <br /> pack across the screen from bottom of the boring to six inches above the top of slot. Once the sand <br /> is in place the well will be surged to stabilize the sand pack and if necessary more sand will be <br /> added. Two feet of hydrated bentonite will then be used above the sand as a sanitary seal. Neat <br /> cement with less than 5% bentonite will be placed on top of the bentonite seal to surface, where <br /> surface security will be provided by the placement of a 6 inch diameter by 12 inch deep traffic rated <br /> Water tight traffic box secured with concrete shoulder, see Figure 4 for well construction details. A <br /> locking thermos type well cap will be placed at the casing top to secure the monitor well. <br /> The B zone well MW9B will be drilled approximately 3 feet east of the well MW9A, see Figure 3. <br /> Drilling will-be as described above, with drilling/coring to the 27 foot depth. Core examination <br /> will determine the proper placement of the 5 foot length of 2 inch diameter, 0.02 inch slotted PVC <br /> screen. Monitor well construction will: be similar to that described above except #3 sand will be <br /> used, see Figure 4 for well construction details. <br /> 5 Sanchez WORKPLAN 9-03 <br />