Laserfiche WebLink
s <br /> ♦ Tra ott of water samples to a state-certified laboratory. <br /> TAM♦ - L,akmd=AMhMjj <br /> Anabsis of (5)soil samples aml thi+ *(3) crater samples.All sample will <br /> be autjwdtoi tom petmicum hydiock (TPH as $ante) and vdatlie <br /> aromatics M in aecorilance aft approved EPAmethods. <br /> Two sal sates will also be analyzW for total lead,if required by the PHS/EHD. <br /> TAM 5 - Re # <br /> ♦ Preparation.of a report. A report wilt be prepared which summarizes the results of <br /> the investigation.The report w-M be steed by a Registered Peolo$ist.Upon approval <br /> of the (Beat, the report will be`transmitted to the PHS1EHI). <br /> ♦ Regulatory liaison. <br /> TAS b - t?ttarmrhr C d r Mogi <br /> PI&OW guidelines state that wells should be monitored and sampled on a quarterly basis. <br /> N elle PE S/EHD requires quarW*'growAWater monitoring at the site, each quarter, the <br /> Wowing tasks will be completed: <br /> ♦ Groundwater depth measurements.The depth to groundwater will be measured in <br /> each well (3 wells).- <br /> ♦ Each well will be pulled of standfing water to stabilize groundwater,parameters{pK <br /> temperature, conductivity). <br /> ♦ Collection of one (1) groundwater sample from each well. A total of three (3) <br /> samples will be collected each quarter. <br /> ♦ Trus of'Swundwater amples .to a state-wMad laboratory for analysis. <br /> w� be for TPH as and ETE&X- in accordance with <br /> Samples analyzed gee <br /> approved EPA methods. <br /> ♦ PreparatioII cif a Quarterly headwater Monitoring_ Report. Each quarter, a <br /> quarterly report will be grepwe& The report will include` all necessary maps, <br /> calculatioIIs and descriptions of site activities. The report will be signed by a <br />