Laserfiche WebLink
Rexistered Geologist <br /> 3.0 Ct3ST <br /> The cost for the abduce serer (TASK'S 1 - 3) should not exceed 3#5.00. The cost for. <br /> Quarterly Monies (TASK 6s optional) should not exceed $100.00 per quarter. The <br /> e quoted ate based on the scope of w"k as dismissed above and on our Standard <br /> Schedule of Charges; all oom will be billed to the Client on a-tune and materials basis. The ,. <br /> cost breaWk wn is as follaws: <br /> zxf{» Permits -563.00 <br /> t MW <br /> 99 <br /> TASK <br /> �� mel#Smplg fi 3 .tlQ <br /> 5` roration <br /> :, flt3.. <br /> Per qtr <br /> TEAL(T <br /> 1w - <br /> s <br /> This cost is-based upon the drilling and installation of two (2) monitoring; wells assuming�'�` <br /> normal drilling conditions.-If adverse Chilli�tg conditions are encountered .(i.e.,:bedrock, <br /> . �-sands,caving,-etc.} :additional dn'lling time is required to complete the sco of <br /> work;the::final-invoice will be idted accordingly:-Under no circumstances:VRH additional, <br /> _ work I performed sithout prior authorization to proceed from Mr. 1 Peters. <br /> 4.0 PAYM W SCHEDUIX - <br /> CieoMM shall submit_demonthly invoices to Mr. Bill-peters for.payment. Invoices <br /> wiU specify the actual costsincurred during the billing period.The invoices will detail when <br /> the services were performed a breakdown for direct labor,indirect costs,travel,equipment, <br /> materials and supplies, and subcontractor services. Authorization of this proposal shallbe <br /> consummated with a deposit of SI,S O-00, <br /> Gm**+AM&%^in%L. 4 <br /> .. <br />