My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE 6141201010:25 AM PAGE 13 of 19 <br /> u wtn.0 <br /> .,w SIM <br /> aF.r <br /> L <br /> 1'SW TEE 2"WREDUCINO <br /> C. 1/2)NSER7 SUP-ON ISDN FLANGE <br /> 2150/ RF FLANGED <br /> 1/2-SALL VALVE GATE VALVE <br /> W/PLUG <br /> I 2'NOZZLE WIN 1500 FLANGE <br /> 1/2NIPRE <br /> Ill `(IN TANK SHELL) <br /> PR VALVE CONSOUDATE <br /> 1990-C VERTICAL MOUNT TO <br /> KEEP SEATS CLEAN .� <br /> NOZZLE WITH 1501 FLANGE <br /> * TANK SHELL) <br /> I'SW EL60W <br /> 1'UNION -1'SW TEE <br /> T'NIPPLE <br /> 1/2-NIPPLE <br /> 1/2'RALL VALVE Tp NK GATE VALVE <br /> W/PLUG <br /> 1'.. 1/2'INART <br /> —1'NIPPLE <br /> I-SOCKOLET 3000# <br /> Y 150#RF FLANGED PPOOUCT LINE NOTE: <br /> GATE VALVE FIELD ROUTE PIPING TO PREVENI IRIPPNG <br /> HAZARD AND VALVE ACCESS. <br /> New Pipe Support <br /> (ITEM 111 CODE S) <br /> 1. There is a 2°check valve connected the bottom inlet gate valve with a threaded flange.The piping to these <br /> valves has no support.The threaded flange shall be seal welded and a new pipe support shall be installed as <br /> drown below. <br /> 2. The flange threads shall be cleaned and prepared for welding.The flange to pipe juncture shall be seal <br /> welded with a minimum of 2 pass and no more than 3 passes full fillet weld all around utilizing E6010(mot) <br /> and E7016(cap&fill)electrodes. <br /> 3. Pipe Wald Teson• • ' and Inspection. <br /> a. • F • The weld root pass shall be visually inspected(VT)by a BP representative. <br /> b. • • • • The weld final pass shall be visually inspected(VT)by a BP representative. <br /> C. The completed welds shall be Dye Penetrant examined(PT)by NDE contractor and <br /> witnessed by a BP representative. <br /> Stockton, • Job Package No: 1 • • 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.