My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: 61412010 10,25 <br /> 4. The piping shall be hydrotested to 1.5 times maximum operating pressure. The piping shall be drained and <br /> blown dry after the test. <br /> 5. • .• The piping shall be hydrotested by repair contractor and witnessed by a BP repnesentative. <br /> S. A naw pipe support shall be Installed on the"piping*side of the valve and check valve.The adjustable pipe <br /> support shall be fabricated from A36 material.The support shall include a threaded rad with double laking <br /> nuts. <br /> 7. A 12"diameter reinforced concrete pipe support shall be insisted approximately 6"above grade and <br /> extending to a depth of approximately 24' The 3,000 psi concrete support shall be reinforced with a 4-#4 <br /> vertical bars and a#3 spial reinforcement @ 6"sparing. <br /> 8. • • •• The pipe support shall be visually Inspected(VT)by a BP representative. <br /> g. • • "• The completed Installation shall be visually inspected by yas BID representative. <br /> I <br /> _ PIPE • � <br /> 7 1a' <br /> 114-DA MEPIOE TOCITOB <br /> 1n• <br /> EMBEDDED PIAIE OR <br /> STRUCTURPL STEEL <br /> 114• <br /> f` d <br /> IM+POE <br /> Painter's Hitch <br /> (REM 151 CODE 5) <br /> 1. The fixed cone roof has one painters hitch that is attached to a circular steel plate that is bolted to the roof <br /> plate.The existing painters hitch,circular steel plate and attachment bolts shat be removed and replaced <br /> with two(2)approved hitches as shown below.One(1)new hitch shall be instated in the center of the mot <br /> and the other new hitch shall be installed approximately 3'in a radial direction away from the center of the <br /> tank roof. <br /> 2. The existing bolt holes shall be plug welded or patched at the discretion of the contractor. <br /> 3. Patches shall be a 1/4"thick minimum 6"diameter A-36 plate seal welded all around with a full and complete <br /> 3/16"fillet weld. <br /> 4. A standard AN 650 Figure 5-22,4"painters hitch shall be installed near the center of the cone roof. <br /> 5. The nof <br /> itch shall be installed with approved fillet welds utilizing E7018 electrodes. <br /> 6. At welds shall be visually Inspected(VT)by a BP representative. <br /> 7. All welds shall be Dye Penetrant examined(PT)by a BP representative. <br /> 8. • The completed work shall be visually(Vn inspected by a BP representative. <br /> �ideW� xaw.emun•w. <br /> u•Y+ � r �•mrw <br /> ° r <br /> .e <br /> Terminal: Stockton, CA Job Package No: 10-STO-CA-01 <br /> eMW4.1 1.,.uw. <br /> 4. <br /> MeN f�•M1 <br /> •nW <br /> isue Eg-aeFRrabba>opel <br />
The URL can be used to link to this page
Your browser does not support the video tag.