Laserfiche WebLink
LDATE. 6/24/20108:45 AM PAGE: 5 of 63 <br /> • t r s • r a <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) (BP Form) <br /> Required:Yes No❑ <br /> g154D"I rav_a_11-06.8B Tank Certification of Hydra Testina.doc <br /> A Tank Certification of Hydro Testing shall be completed if required, <br /> POST INSPECTION RE UIREMENTS (Job Representative) (BP Form) <br /> Required: Yes No <br /> 915.100-15 rav a_11-13-08 Return to service Checklistxls <br /> The Return to Service Checklist shall be completed to verdy that the lank is ready to return to service and that tank <br /> is operating as expected upon initial return to service. During the walk down for the realm to checklist,several <br /> personnel shall be hwilved for example:Job Rep,Terminal Manager or designee,Tank Coordinator,and any <br /> additional may attend. <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) (BP Forn1) <br /> Required: Yes ® Na Lj <br /> ❑ 915.100-22_rev_a_11-13-08 Floating Roof Inspection Procedures 2006 B.doc <br /> This form shall he completed for all floating roof tanks seals. This document addresses procedures,applicability, <br /> and compliance determination for ficafing root inspections required by air rules. To use this document,complete <br /> the inspection checklists during the Reading roof inspection. Then use the inspection checklist to complete the <br /> compliance determination form to determine whether the floating roof complies with the inspection requirements <br /> that apply to the tank. <br /> >: External Floating Roof Tanks Seals <br /> -During Hydra Testing:Seals shall be inspected during hydro testing while roof is floating. <br /> •No-Hydro Testing:Seals shall be visual inspected and documented during the post Inspection. <br /> Y internal Floating Roof Tanks Seals <br /> -Post Inspection: Floating roof seals shall be inspected while mor Is setting on the logs. <br /> -In-Service,Inspection:After tank is floating with water or product the seals shall be Inspected <br /> from the roof manway. <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) (BP Form) <br /> Required: Yes© No Lj <br /> 915-100-00 rnv_e_tt-06-0a Febriceled Equipment Tanks Ropeicdoc <br /> All mechanical tank repair contractors shall fill out the Fabricated Equipment Tank Repairs. This form complles <br /> that aft repairs were repaired In accordance with API 653&550. Tank Coordinator shall be responsible to have <br /> the repair contractor fill out as much as possible and forward to the Tank Inspection Authority for completion <br /> signoff and record keeping. <br />