My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required:Yes No <br /> Helium TestlCantractor <br /> A procedure shall be provided by the Contractor that will perform the Helium Test that specifiers the locations and <br /> size of injection noes required to inject helium underneath the tank bottom.The SP representative shall confirm <br /> wish BP Engineering that the'Fitness-For-Service Evaluation'has been performed and a copy shall be attached to <br /> this lob package <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required:Yes ® No❑ <br /> 915-300-08 rev a 11-20-08 Visual Examination Report Information for Coatings <br /> All mating inspection requirements shall be received by the coaling contractor. Shall verify that all Coating <br /> Inspection Documentation is in completed 8 in the DOT Bax. A copy shall be loaded in the TLR. If Inspect reports <br /> are not completed and an site notify the job representative as soon as possible. Reference BP Tank Coating <br /> checklist and specification. <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required: Yes E] No <br /> Finite Element Analysis <br /> During the post inspection verify if a Finite Element Analysis was performed if so make sure the report is in the fie <br /> Job box. Attach a copy to the post Inspection report In the TLR.Reporting Tool. <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required: Yes ❑ No <br /> Fitness for Sc"Im <br /> During the post Inspection verify that the Fitness for Service report is in the file job box. Attach a copy to the post <br /> inspection replan in the TLR.Reporting Tool. This tank shall not be Hydro tested.In accordance with API-653 <br /> 12 3 2 7 a"Fitness-For-Service Evaluation"shall be performed by an engineer experienced in storage tank design <br /> and the evaluation methodologies used following the procedures and acceplance criteria established by API.The <br /> SP representative shall confirm with BP Engineering that the"Fitness-For-Service Evaluation'has been performed <br /> and a copy shall be attached to this job package. <br /> POST INSPECTION RE UIREMENTS (Inspection Contractor) <br /> Required: Yes❑ No <br /> Edge Settlement Analysis. <br /> During the post Inspection verify if a Edge Settlement Analysis was performed if so make sure the report is in the <br /> file lob box. Attach a copy to the post inspection report in the TLR.Reporting Tool, <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required:Yes❑ No <br /> Sand Analysis ;v <br /> ni'ri 11I _ Irr�_f� 'ys , til; _ .) Z, 1'��STI ' iis� G?�c7J; ' ��•'J,( <br />
The URL can be used to link to this page
Your browser does not support the video tag.