Laserfiche WebLink
POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required:Yes No <br /> Helium TestlCantractor <br /> A procedure shall be provided by the Contractor that will perform the Helium Test that specifiers the locations and <br /> size of injection noes required to inject helium underneath the tank bottom.The SP representative shall confirm <br /> wish BP Engineering that the'Fitness-For-Service Evaluation'has been performed and a copy shall be attached to <br /> this lob package <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required:Yes ® No❑ <br /> 915-300-08 rev a 11-20-08 Visual Examination Report Information for Coatings <br /> All mating inspection requirements shall be received by the coaling contractor. Shall verify that all Coating <br /> Inspection Documentation is in completed 8 in the DOT Bax. A copy shall be loaded in the TLR. If Inspect reports <br /> are not completed and an site notify the job representative as soon as possible. Reference BP Tank Coating <br /> checklist and specification. <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required: Yes E] No <br /> Finite Element Analysis <br /> During the post inspection verify if a Finite Element Analysis was performed if so make sure the report is in the fie <br /> Job box. Attach a copy to the post Inspection report In the TLR.Reporting Tool. <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required: Yes ❑ No <br /> Fitness for Sc"Im <br /> During the post Inspection verify that the Fitness for Service report is in the file job box. Attach a copy to the post <br /> inspection replan in the TLR.Reporting Tool. This tank shall not be Hydro tested.In accordance with API-653 <br /> 12 3 2 7 a"Fitness-For-Service Evaluation"shall be performed by an engineer experienced in storage tank design <br /> and the evaluation methodologies used following the procedures and acceplance criteria established by API.The <br /> SP representative shall confirm with BP Engineering that the"Fitness-For-Service Evaluation'has been performed <br /> and a copy shall be attached to this job package. <br /> POST INSPECTION RE UIREMENTS (Inspection Contractor) <br /> Required: Yes❑ No <br /> Edge Settlement Analysis. <br /> During the post Inspection verify if a Edge Settlement Analysis was performed if so make sure the report is in the <br /> file lob box. Attach a copy to the post inspection report in the TLR.Reporting Tool, <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required:Yes❑ No <br /> Sand Analysis ;v <br /> ni'ri 11I _ Irr�_f� 'ys , til; _ .) Z, 1'��STI ' iis� G?�c7J; ' ��•'J,( <br />