Laserfiche WebLink
Valley Pacific Petroleum Services Stockton,CA <br /> Spill Prevention,Control,and Countermeasure Plan <br /> • Commissioning of containers; <br /> • Reconstruction, replacement, or installation of piping systems; <br /> • Construction or demolition possibly altering secondary containment structures; <br /> • Changes of product or service; <br /> • Revisions to standard operation; <br /> • Modification of testing/inspection procedures; and <br /> • Use of new or modified industry standards or maintenance procedures. <br /> 2. Non-Technical Amendments <br /> The facility owner and/or operator may make documented non-technical amendments. <br /> Non-technical amendments may include but are not limited to these changes: <br /> • Change in the name or contact information (i.e., telephone numbers) of individuals <br /> responsible for the implementation of this Plan; or <br /> • Change in the name or contact information of spill response or cleanup <br /> contractors. <br /> B. Location of SPCC Plan <br /> In accordance with 40 CFR 112.3(e), a complete copy of this SPCC Plan is kept onsite. <br /> 5 <br />