My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
15135
>
3500 - Local Oversight Program
>
PR0544644
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:28:28 PM
Creation date
7/10/2019 4:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544644
PE
3529
FACILITY_ID
FA0005287
FACILITY_NAME
H & H MARINA
STREET_NUMBER
15135
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06908021
CURRENT_STATUS
02
SITE_LOCATION
15135 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br /> Cl <br /> r= <br /> E <br /> T <br /> CONDOR EARTH TECHNOLOGIES INC. <br /> r.rte. <br /> 1125 N. Golden State Blvd. 188 Frank West Circle <br /> August 3, 2000 Suite G Suite I <br /> Turlock, CA 95381 Stockton, CA 95206 <br /> (209) 668-9256 (209) 234-0518 <br /> FAX (209) 668-9257 FAX (209) 234-0538 <br /> Mr. Ron Rowe <br /> San Joaquin County <br /> Public Health Services <br /> Environmental Health Department <br /> P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> RE: Extension of Report Submittal Date,Herman and Helen's Marina,Venice Island Ferry, <br /> Stockton,CA <br /> Dear Mr. Rowe: <br /> This letter is intended to document our telephone conversation of earlier today regarding an extension of <br /> the due date for submittal of a report of findings for the additional soil and groundwater investigation to <br /> be conducted at the property adjacent to the east portion of the above referenced site. Your letter dated <br /> June 30,2000, indicated that the report was to be submitted not later than September 1, 2000. In <br /> subsequent voice mail messages,I requested that you consider extending the report due date to a time <br /> that would allow the fieldwork to occur after the middle of September. This would allow access to the <br /> property after the corn planted in the location of the proposed borings was harvested. In our subsequent <br /> telephone conversation today,you indicated that this was an undesirable delay and might push the work <br /> into the rainy season(thus, creating an access problem due to muddy conditions). In response, I further <br /> indicated that there were several obstacles to overcome to meet the schedule. The following activities <br /> need to be completed: <br /> 1. The Amendment to the Work Plan (dated May 27, 1998)and Work Plan Addendum(dated July 9, <br /> 1998), dated July 24, 2000, prepared by Condor Earth Technologies,Inc. (Condor),was submitted to you <br /> on July 28, 2000, in response to the above referenced letter dated June 30, 2000. Your approval of the <br /> Amendment is pending. <br /> 2.A site access agreement with the adjacent property owners must be obtained. The final apparent <br /> obstacle in receiving the site access agreement concerns insurance coverage required by the adjacent <br /> property owner. The adjacent property owner has required insurance coverage that Condor does not <br /> routinely carry. However, Condor is meeting the additional insurance demands with additional funds. <br /> Therefore, if there are no further delays related to the demands of the adjacent property owner,the site <br /> access agreement should be executed in the near future. <br /> ENVIRONMENTAL GEOLOGICAL ENGINEERING GEOTECHNICAL <br /> http://www.condorearth.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.