My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
308
>
3500 - Local Oversight Program
>
PR0544650
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:36:13 PM
Creation date
7/11/2019 11:52:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544650
PE
3528
FACILITY_ID
FA0003520
FACILITY_NAME
DENS AUTO REPAIR INC
STREET_NUMBER
308
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
149063301
CURRENT_STATUS
02
SITE_LOCATION
308 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 June 2010 <br /> AGE-NC Project No. 95-0135 <br /> Page 3 of 7 <br /> 3.2. DRILLING AND SOIL SAMPLE COLLECTION <br /> AGE proposes to advance thre.&pilot_soil boring off-site for installation of groundwater monitoring <br /> wells.Wells will be installed using a1ruck-mounted,hollow-stem;drill rig uippedwith_ .25-inch. <br /> hollow-stem augers to advance two pilot soil borings-to Approximately.651eet below surface grade <br /> (bsg) and one pilot soil boring to-approximately.120.,feet bsg; total depths ofthe well borings may, <br /> vary according to hydrogeologic/geologic conditions encountered during drilling..Proposed ground <br /> water'monitoring:well locations.-are as'follows: <br /> Two pilot soil borings will be advanced across Lafayette.Street near CPT-3 to total depths <br /> of approximately,65.feet(HU2) and Qq feet bsg(HU3);,and <br /> • One pilot soil boring will`be advanced across El Dorado Street near CPT-4 to a total depth <br /> of approximately 65..feet bsg(HU2). , <br /> Selected soil samples will be analyzed by a State of California Department of Public Health Services <br /> (CDPH)-certified laboratory for:the following constituents: <br /> • Total petroleum hydrocarbons quantified_ as gasoline (TPH-g) in accordance with EPA <br /> Method 8015 Modified; and - <br /> • Benzene, toluene, eth lbenzene and xylenes (BTEX);.and fuel additives meth .1.tertiary- <br /> butyl-ether(MTBE), butyl alcohol(TBA) di.iso;ropyl ether(RIPE ethyl tertiary- <br /> butyl ether(ETBE),tertiary-amyl methyl ether(TAME;1,2-dibromoethane <br /> dichloroethane (I,2-DCA)in accordance with EPA Method.8260B. <br /> Laboratory reports of soil analysis, testing methods; laboratory qui ality.assurance/quality control <br /> (QA/QC) reports, and sample chain of custody documentation will be presented in a report of <br /> findings and recommendations. <br /> 3.3. MONITORING WELL INSTALLATION,DEVELOPMENT AND SURVEY <br /> Two pilot soil borings will be completed as.ground water.monitoring wells.screened from 60 feet <br /> to 65 feet bsg; one pilot soil boring will.be completed as a ground water monitoring well screened <br /> from 110 feet to 120 feet bsg. However,well screen-placehlentmay be modified in the field based <br /> .on lithology encountered in.the borings. Following Installation, the wells will be developed to <br /> maximize water flow and minimize.the amount of fine-grained sediment drawn into the wells during <br /> pumping or bailing,and the top of the newly installed well casings(well head)will be surveyed by� <br /> a California-licensed surveyor. Procedures for well installation, development and survey are <br /> presented in Sections 3.2. and 3.3.,respectively. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.