My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007805
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:10:03 PM
Creation date
7/15/2019 4:26:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007805
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1k <br /> SYSTEM IYSTA LATIONAND START-UP <br /> 4 Follow each step fisted here in exactly the order Fisted. For your safety, do not slop <br /> any steps or performs any steps out of order. <br /> Installation- <br /> 1 Level the s3ad or trailer mounted system where you require installation on a dry <br /> surface. <br /> 2. Connect the properly rated electoral supply with a ground to the control panel main <br /> dtsconnect usmg a qualified electrician- <br /> 3 Check voltage, wire size and amperage rating of electricity installed, making sure <br /> that it matches the manufacturers panel spectficathons and electrical drawings before <br /> proceeding <br /> 4 Connect the process connection from the extraction wells We recommend an <br /> additional dilution valve be installed prior to the system entramnzent separator <br /> 5 Check 120-volt power circuit to see that all controllers and the chart recorder are <br /> powered up <br /> 6 Check rotation of the VES blower, liquid pump making stare they are correct <br /> Start-up Procedures- <br /> 1 Verify that the MAIN DISCONNECT switch on the control panel is m the "OFF" <br /> position <br /> 2. Turn the power"ON" at main power supply <br /> 3 Open the system control panel door and have a qualified electrician verify that the <br /> voltage at the top of the MAIN DISCONNECT is to manufacturer speciEcation. <br /> 4 With the control panel door closed and latched, turn the MAIN DISCONNECT <br /> switch to the "ON"position <br /> 5 Check that the EMERGENCY STOP switch is m the "OUT"position. <br /> 6 Turn the CONTROL POWER switch to the "ON" position. The controllers should <br /> come on along with the chart recorder <br /> 7 Push the BLOWER START button, the blower should come on and the LOW AIR <br /> FLOW ALARM light should go out. <br /> S. The SYSTEM OPERATIONAL light should come on, the oxidizer should begin <br /> heating up and the SYSTEM OFF light should go out <br /> 9 The TEMPERATURE CONTROLLER should come up to the 650°set point. <br /> 10 At 600° F the SYSTEM AT TEMPERATURE light should come on and the unit <br /> should slowly start to open the process isolation valve and close the dilution valve <br /> If any red alarn lights are on, the system will not become operational and will not <br /> come up to temperature. In the event of an Emergency, push the EMERGENCY <br /> STOP button <br /> Alarms are described below: i <br /> 1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.