Laserfiche WebLink
I <br /> 01 July 2008 <br /> AGE-NC Project No. 97-0301 <br /> Page 3 of 8 <br /> volatile aromatic compounds (benzene, toluene, 5hylbenzene and xylenes: BTEX), methyl tertiary— <br /> butyl ether (MTBE), t-amyl methyl ether (TAME), di-isopropyl ether (DIPE),7and 1 ,2-dichloroethane <br /> (1,2-DCA). <br /> P)J, <br /> or l' <br /> 2.3 . INSTALLATION OF REMEDIATION WELLS <br /> Based on recent quarterly ground water/monitoring events performed at the site, depth to ground <br /> water was generally measured at 27 feet below surface grade (bsg). Currently, wells MW-6 and <br /> MW-7 (screened 20 to 40 feet) are each partially screened through the vadose zone and are locate <br /> somewhat near the-'the gasoline-impacted soil core area at the site; AGE anticipates utilizing wells <br /> MW-6 and MW-7 as observation wells during the SVE pilot test. <br /> -Forms°° <br /> Significant gasoline-impacted soil extends vertically beneath the exr 11STSand fuel dispenser <br /> areas to depths of at least 40 feet bsg, and has spread laterally towards the east-northeast at least 55 <br /> feet (Figures 3 through 6). Therefore, to estimate the feasability of soil vapor extraction in the vadose S ' a <br /> zone, AGE is proposing to install three SVE wells to total depths of 30 feet bsg (just below the '�Y , vV <br /> approximate ground water level); wells will be installed in the following locations in anticipation <br /> of each well being included within a future SVE remediation network: <br /> • A four-inch diameter SVE well (VW4), screened between 10 and 30 feet bsg, will be <br /> located approximately 15 to 25 feet south of monitoring well MW- 1 . <br /> • A four-inch diameter SVE well (VW-2), screened between 10 and 30 feet bsg, will be <br /> located approximately 5 to 15 feet east-southeast of monitoring well MW- 1 . <br /> • A four-inch diameter SVE well (VW-3), screened between 10 and 30 feet bsg, will be <br /> located approximately 30 to 40 feet southeast of monitoring well MW <br /> Proposed SVE well locations are depicted in Figure 2; the lateral extent of gasoline-impacted soil <br />�is depicted in Figure 3 , respectively; general lithology and the estimated vertical extent of <br /> gasoline-minpact to-soil-beneath-the--siteF-is-depicted-in-cross-sectional-views-E=E'and-FF'-o��, <br /> Figures 5 and 6, respectively. The proposed SVE screen intervals are located in areas of known soil <br /> gasoline-impact. Procedures for well installation are presented in Section 3 .2 . <br /> Initially, soil borings/SVE wells VW- 1 , V W-2 and VW-3 will be advanced to depths of 30 feet bsg, <br /> however, total depths of each borings and/or screen intervals may be adjusted in the field and will <br /> be based on field observations and field screening using an organic vapor monitor (OVM) equipped <br /> with a photo ionization detector with a 10.3 ev map (PID) capable of measuring volatile organic <br /> compounds. Soil samples will be collected at five-foot intervals beginning at a depth of 10 feet bsg <br /> to the total depth of the pilot borings; howev i soil samples are 01 roposed for laboratory <br /> Advanced GeoEnvironmental, Inc. <br />